Stay informed on the latest in solid waste management with updates from Bryan Leamons, P.E., Engineer Supervisor at ADEQ's Solid Waste Management Division. Explore topics like coal combustion residuals, drilling wastes, operating plans, AEIR forms, cost worksheets, and more. Understand the significance of the Transfer Station General Permit, compliance topics, and common deficiencies to avoid. Get expert advice on industrial, special, and commercial waste handling, stormwater permits, and financial assurance requirements. Contact Bryan Leamons for further information.

Rendezvous with Technical Branch - slide 1
01 / 25Rendezvous with Technical Branch
1 / 17

Télécharger la présentation

Rendezvous with Technical Branch
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. Rendezvous with Technical Branch Bryan Leamons, P.E. Engineer Supervisor ADEQ - Solid Waste Management Division

  2. Updates 2011 SWEPCO Turk Landfill Coal Combustion Residuals Drilling Wastes Operating Plans AEIR Forms – Cost Worksheets Overfills Liquid Bulking Plans Transfer Station General Permit

  3. Transfer Station General Permit General Permit – A single or common permit issued by the Department following public notice and comment for a class of solid waste processing facility owners and operators. Eligible owners and operators may construct and operate under the terms of the general permit without obtaining an individual permit. [APC&EC Reg. 22.102] New Type TS issued May 13, 2011 Notice of Intent (NOI) due July 29, 2011

  4. Old Permit - Problems Financial assurance adequacy Poorly developed operating plans Special handling/storage for industrial, special, or commercial wastes or recyclables Sorting and storage activities Stormwater permits Unpermitted discharges

  5. New Permit - Highlights No HHW collection/processing (unless exempt) Operating plans 3-day storage limit No dirty MRFs - Type WRF

  6. Closure Estimates - Financial Assurance Requirements A – $5,000 B – $10,000 C – $20,000 D – $30,000 Based on a 3-day storage limit and broad cost assumptions for loading, hauling, and disposal Amounts adjusted after stakeholder input

  7. Notice of Intent (NOI) More thorough Complete submittal of attachments required Professional Engineer required [22.301(i)] Industrial or special wastes Specifically referenced by the general permit

  8. Common Deficiencies Applicant or facility information incomplete Information inconsistent Location restrictions Site plan – boundary survey – drainage features Incomplete operating plan – wash-down No stormwater permit No financial assurance No PE review or certification

  9. Compliance Topics Capacities cannot be exceeded Water permitting affects facility design Modifications to design or operation Additional industrial or special materials Recordkeeping – Condition 23 Annual Reports – Condition 24

  10. Compost General Permit Draft permit not issued yet “Acceptable methods of composting” Stormwater - process water -leachate Financial assurance Stakeholder process planned for this spring

  11. Contact SW DivisionTechnical Branch Staffleamons@adeq.state.ar.us501-682-0587