NOAA IJPS Equipment Refresh Integration and Testing

NOAA IJPS Equipment Refresh Integration and Testing . Kirk Liang POES Ground System Project Manager May 31, 2013. IJPS Technology Refresh. Existing IJPS Ground System Equipment No changes to existing requirements and no impact to current operations IJPS Technology refresh include:

nusa
Télécharger la présentation

NOAA IJPS Equipment Refresh Integration and Testing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NOAA IJPS Equipment RefreshIntegration and Testing Kirk Liang POES Ground System Project Manager May 31, 2013

  2. IJPS Technology Refresh • Existing IJPS Ground System Equipment • No changes to existing requirements and no impact to current operations • IJPS Technology refresh include: • Replace POES Data Server (PDS) at NSOF and Wallops CDA. • Supports Transatlantic GAC, STIP, SAIP • Supports TM, TC, HRPT, Blind GAC from Svalbard • Replace PTP’s at Wallops and Fairbanks CDA. • Supports Metop HRPT • Low Rate CCSDS Data Processors • Replace X-Band Down-Converters/X-Band Data Server • Fairbanks Only • Metop High Rate CCSDS data processors output (GDS data) • Upgrade S-Band Modems • Telemetry and Tele-Commanding Modems • S-Band Metop HK Telemetry and Tele-commanding.

  3. IJPS Ground System Overview

  4. IJPS Refresh Regression Tests • POES Data Servers (PDS) at NSOF and Wallops • The following tests were successfully completed using data from NOAA 18 and 19 with coordination between EUMETSAT, WCDAS & NSOF • TM/TC/GAC/HRPT • Link verification • Validated commanding, telemetry, receipt of HRPT, and Blind GAC • EUMETSAT verified equipment set up • ESPC validated GAC data, NSOF verify TM and HRPT • NSOF and Wallops validated data • Tested flowing simultaneous data streams • Tested interruption of data

  5. IJPS Refresh Regression Tests (cont) • PTP at Wallops • The following test was successfully completed • Metop 2 was used to retrieve MHRPT data • NSOF verified reception and validated the data • PTP and TM/TC at Fairbanks • The following tests need to be accomplished with coordination between EUMETSAT, FCDAS & NSOF • Receive and validate TM data (EUMETSAT) • Validate carrier lock, AGC level, and verify command coordination

  6. IJPS Refresh Regression Tests (cont) • GDS at Fairbanks • The following tests are to be accomplished initially with co-visibilitypasses and eventually with a full GDS Dump • Verify and validate streaming data from Fairbanks, NSOF, and EUMETSAT • On a mutually agreed date using a predetermined pass validate the data recorded on DVD and sent to EUMETSAT

  7. IJPS Refresh Testing Schedule • Existing functionality Tests • Factory Testing • NSOF PDS Server Testing 1/16/12 – 03/28/2013 (Completed) • Wallops PDS Server Testing 3/1/2013 – 04/30/13 (Completed) • NSOF GDS Server Testing 4/1/2013 – 6/30/2013 (On-going) • Fairbanks GDS Server Testing 7/01/2013 -8/30/2013 (On-going) • Site Testing • Initial Wallops System Test – 6/2013 • Initial Fairbanks System Test – 8/2013 • CDAS and NSOF final System Test - 9/2013