1 / 4

Mandatory Measures in Subpart 2

Mandatory Measures in Subpart 2.

Télécharger la présentation

Mandatory Measures in Subpart 2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mandatory Measures in Subpart 2 Issue: Should prescribed requirements of Subpart 2 apply in all 8-hour nonattainment areas classified under subpart 2, or is there flexibility to apply equivalent measures, or drop some requirements altogether if in certain narrowly defined circumstances they are determined to be inappropriate?

  2. Subpart 2 Mandatory Requirements • Include e.g., NSR size cutpoints, specific ROP requirements (including 15% VOC reduction for moderate areas), size cutpoints for RACT, NOx RACT, Stage II vapor recovery, etc.)

  3. Options • Option 1.Assume no changes can be made to the statutory requirements of subpart 2. • Option 2.Identify (if possible) a legal justification to allow areas covered under subpart 2 to substitute measures that will provide equivalent ozone reductions.

  4. Options (cont’d) • Option 3. Identify (if possible) a legal justification to allow EPA to determine on a case-by-case basis which of the mandatory control measures under subpart 2 can be waived by the State in preparation of its attainment demonstration. • Option 4. Review each of the individual control requirements in subpart 2 to determine what, if any flexibility may be provided for that specific requirement

More Related