UCSB 4-Hybrid Thermal Test System Status

UCSB 4-Hybrid Thermal Test System Status. 18 August 2003 Sam Burke UCSB HEP Group. Progress. New Cold Box sealing features added Improved gasketing Spring action clasps Sealing of foam insulation Cold Cycle Testing Run 4 33 Min cycle time 10 deg C Chiller, 0.1 L/m dry air flow.

oceana
Télécharger la présentation

UCSB 4-Hybrid Thermal Test System Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UCSB 4-Hybrid Thermal Test System Status 18 August 2003 Sam Burke UCSB HEP Group CMS 4-Hybrid Test System Sam Burke EE

  2. Progress • New Cold Box sealing features added • Improved gasketing • Spring action clasps • Sealing of foam insulation • Cold Cycle Testing Run 4 • 33 Min cycle time • 10 deg C Chiller, 0.1 L/m dry air flow CMS 4-Hybrid Test System Sam Burke EE

  3. New Clasps / Air Lock CMS 4-Hybrid Test System Sam Burke EE

  4. Cold Cycle Run 4 CMS 4-Hybrid Test System Sam Burke EE

  5. Progress • Cold Box Run 6 and 7 • Max chiller fluid flow rate • Chiller at 5 deg C • Minimum Dry Air Flow • adjusted by observing bubbler • Run 6: 24 min • Run 7: 22 min CMS 4-Hybrid Test System Sam Burke EE

  6. Runs 6 and 7 CMS 4-Hybrid Test System Sam Burke EE

  7. Future Plans • Move Hybrid Cold Box into Clean Room • Integrate Cold Box Slow Control with the ARC Test System CMS 4-Hybrid Test System Sam Burke EE