1 / 6

UCSB 4-Hybrid Thermal Test System Status

UCSB 4-Hybrid Thermal Test System Status. 10 June Sam Burke UCSB HEP Group. Progress. Work on system design Breakout boards ordered Sensor connectors specified and ordered Solenoid Valves received ARC PC Card Cage received. Progress. Solid State Relays Arrived

Télécharger la présentation

UCSB 4-Hybrid Thermal Test System Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UCSB 4-Hybrid Thermal Test System Status 10 June Sam Burke UCSB HEP Group CMS 4-Hybrid Test System Sam Burke EE

  2. Progress • Work on system design • Breakout boards ordered • Sensor connectors specified and ordered • Solenoid Valves received • ARC PC Card Cage received CMS 4-Hybrid Test System Sam Burke EE

  3. Progress • Solid State Relays Arrived • Lab View Errors Resolved • File for digital temperature sensor addresses • File for run history required • Power Transformer Board Layout CMS 4-Hybrid Test System Sam Burke EE

  4. Current Needs • NIM Crate from SLAC with plugins • Move BaBar Chiller in CMS Test Lab • Plumb dry air to test system CMS 4-Hybrid Test System Sam Burke EE

  5. Future Plans • Solenoid Valve Panel Layout for shop • Complete Schematics for Analog I/O and Digital I/O Breakout Boards • Set up Temperature Sensors and verify calibration and Communication • Read unique sensor firmware addresses • Generate Digital Sensor file CMS 4-Hybrid Test System Sam Burke EE

  6. Future Plans • Fabricate Analog I/O Breakout Board • Test Humidity Sensor against Sensirion sensor • Fabricate Power Transformer board • Reverse Engineer Peltier Relay Board from CERN CMS 4-Hybrid Test System Sam Burke EE

More Related