FY13 LCAC SLEP RFI Brief August 2012

FY13 LCAC SLEP RFI Brief August 2012. Topic Areas. LCAC History LCAC SLEP TDP (Historical) FY13 LCAC SLEP RFP Procurement Characteristics GFP/CFM ACU 4 Facilities/Services/Tarmac Acronym List. LCAC History. Evolution of LCAC. 1970’s. 1980’s. 1990’s. 2000’s. 2010’s. JEFF A / JEFF B

odessa
Télécharger la présentation

FY13 LCAC SLEP RFI Brief August 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FY13 LCAC SLEPRFI BriefAugust 2012

  2. Topic Areas • LCAC History • LCAC SLEP • TDP (Historical) • FY13 LCAC SLEP RFP • Procurement Characteristics • GFP/CFM • ACU 4 Facilities/Services/Tarmac • Acronym List

  3. LCAC History

  4. Evolution of LCAC 1970’s 1980’s 1990’s 2000’s 2010’s • JEFF A / JEFF B • Prototypes leading to LCAC • LCAC • Initial Craft Delivered in 1984 • Designed for 20-year service life • Capable of carrying a 60-ton payload at speeds over 50 knots • 91 LCAC fabricated • LCAC (SLEP) • +10 yrs service life • Capable of carrying a 72-ton payload at speeds over 50 knots • 39 out of 72 LCAC SLEP craft delivered to date

  5. LCAC Overview • Purpose/Mission: High Speed, Over-the-Beach, Ship-to-Shore Amphibious Capability to Lift All Equipment Organic to the Ground Elements of a Marine Air/Ground Task Force • Capable of Operating from Current and Planned Well Deck Ships and Seabases • LCAC has Accessibility to More than 80% of the World’s Coastlines • Over the Horizon Assault from up to 50 miles Offshore • LCAC are Capable of Carrying a 60-Ton Payload at Speeds Over 50 Knots

  6. LCAC Characteristics

  7. LCAC Timeline/Inventory • 1984: Initial Craft Delivered • Designed for 20-Year Service Life • 1995: LCAC SLEP Study Conducted • 2004: First Craft Reached End of Expected Service Life • 2012: Craft Inventory • 91 Craft Initially Procured • 74 Craft (72 Operational, 2 Test) • 7 Craft Undergoing SLEP • 10 Craft Disassembled

  8. LCAC SLEP

  9. Program Requirements • LCAC SLEP POR: SLEP 72 Craft • Extend Service Life from 20 to 30 Years • Sustain/Enhance Craft Capability • Replace Obsolete Electronics • Correct/Repair Corrosion Damage • Reduce Life Cycle Cost by Improving Reliability/Maintainability • Establish Common Configuration Baseline • “Standard SLEP Configuration”

  10. LCAC SLEP Elements • ENHANCED ENGINES • Provides Additional Power • Reduces Fuel Consumption • Reduces Maintenance • BUOYANCY BOX • REFURBISHMENT • Address Corrosion Problem • 10-Year Service Life Extension • Incorporates Hull Upgrades and Improvements • ROTATING MACHINERY • REFURBISHMENT • Extends Useful Life of Equipment • Reduces Maintenance • DEEP SKIRT UPGRADE • Reduces Drag • Reduces Maintenance • Increases Obstacle Clearance • C4N REPLACEMENT • Introduces Open Architecture • Introduces Modern COTS Equipment • Provides Precision Navigation • Provides Common Tactical Picture • Provides Comm Suite Interoperability • FACT OF LIFE/ OBSOLESCENCE • DESU • Autopilot & AADS • DAGR

  11. Enhanced Engines • Incorporates: • Compressor Variable Geometry Inlet Guide Vanes • Liquid Fuel Metering Valve • FADEC – Full Authority Digital Engine Controller • Bleed Air Anti-Icing System for Cold Weather Operation • Provides: • Additional Horsepower • Increased Engine Reliability • Modern Digital Engine Control Equipment • Reduced Fuel Consumption • Reduced Maintenance Requirements Post SLEP FADEC Pre SLEP

  12. Deep Skirt Upgrade Post SLEP • Reduces: • Drag • Maintenance • Increases: • Performance Envelope • Obstacle Clearance Pre SLEP Deep Skirt (7’) Standard Skirt (5’)

  13. C4N Replacement Post SLEP Fully Integrated Electronics Suite Flat Panel Displays Universal Keyboard Pre SLEP • Introduces: • Open Architecture • Modern COTS Equipment • Provides: • Precision Navigation • Common Tactical Picture • Comm Suite Interoperability • Upgrades: • LN-66 to P-80 Radar • KSQ-1 to EPLRS

  14. Rotating Machinery Refurbishment Shroud • Reduces Maintenance • Extends Useful Life of Equipment Gearbox Two Per Craft Lift Fan Eight Per Craft Four Per Craft

  15. Buoyancy Box Refurbishment Post SLEP • Increases: • Resistance to Corrosion • Upgrades: • Damage Stability Pre SLEP 600 Sq ft (Average) of Buoyancy Box Aluminum is Replaced During SLEP Corrosion & Pitting

  16. Fact of Life/Obsolescence Post SLEP Post SLEP Post SLEP DAGR Pre SLEP DESU AADS Pre SLEP PLGR ESU

  17. LCAC Flights Newer Craft Varying Configuration ACU 4 Craft ACU 5 Craft * Potential FY13 Craft NOTE: Flights 1 – 3 Not Shown

  18. TDP (Historical)

  19. FY13 LCAC SLEP RFP

  20. Procurement Characteristics • FFP Contract • Work to be Performed at ACU 4 • Joint Expeditionary Base, Little Creek, VA • Unrestricted/Nationwide Competition • ABR/MSR Certification Not Required • Unclassified Work Scope • Contract Award for “Best Value” to Government

  21. GFP/CFM • Government will Provide Selected GFP for: • Incorporation Items: • Minimum Buy and LLT (13+ Weeks) • GFP Incorporation Items and Associated Delivery Dates will be Specified in Each Craft’s Planning Memo (Part of the TDP) • Performance Items: • Select Special Test Equipment/Tooling • Contractor will be Responsible for Providing All Other Required: • Material/Equipment • Tooling/Test Equipment • Services, such as Marine Chemist and HAZMAT

  22. ACU 4 Facilities • TFS with Capacity for Three Craft • Space for Laydown Area and Contractor Admin Trailer • Parking for Up to 25 Vehicles • SLEP Contractor Provides Services for Shelter (i.e., Electricity, LP Air) • No Telephone/Data Lines Available to Contractor Space

  23. ACU 4 Services • Travel Lift for Moving Craft • Used by Navy Personnel Only • 48 Hour Advance Notice Required • Craft Crew will be Provided for Craft Trials • Runway Trials • Harbor Trials • INSURV • Fly-Over Block Installation • Two Shipsets: 55” Fly-Over Blocks • HAZMAT Materials • Handled by Contractor in Accordance with ACU 4 Guidelines

  24. ACU 4 Tarmac NSSA Trailer Contractor Parking Row “F” 3 Bay TFS Contractor Receipt and Laydown

  25. Acronym List