An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. Prof. Emin Gün Sirer Fall 2007 Koç University COMP 303Computer Architecture

  2. Course Objective Bridge the gap between hardware and software How a processor works How a computer is organized How to program at the hardware level Establish a foundation for building higher-level programs How to optimize programs How to debug large systems How to deal with complexity

  3. Why Learn Computer Architecture? • Provides an understanding from the bottom up • Even if few people design processors, understanding how processors work is crucial for building working systems • This course will go far beyond processor design to cover all aspects of computer organization, including memory hierarchies, input/output, disk subsystems, peripherals, interrupts and so forth • Engineering pride alone requires full understanding

  4. Fact • There has never been as exciting a time to work on systems hardware and software as now!!! • The world is increasingly dependent on computer systems • Connected, networked, interlinked • People just do not know how to build robust systems

  5. BSOD

  6. BSOD

  7. BSOD

  8. Therac-25 • A safety-critical system with software interlocks • Beam controlled entirely through a custom OS

  9. Therac-25 • Old system used a hardware interlock • A lever that could either be in the “zap” or “x-ray” position • New system was computer controlled • A synchronization failure was triggered when competent nurses used the back arrow to change the data on the screen “too quickly”

  10. Therac-25 Outcome • Beam killed one person directly, burned others, and may have given inadequate treatment to cancer patients • Problem was very difficult to diagnose; initial fix involved removal of the back arrow key from the keyboard • People died because a programmer could not write correct code for a concurrent system

  11. Denver airport • The most modern, most expensive airport in recent history • Cost overrun in excess of $2B • Highly automated luggage handling system was supposed to deliver your luggage to you at arrival • Lack of persistence caused luggage carts to “forget” their contents, sprinkling the luggage on the runway

  12. USS Yorktown • Modern guided missile cruiser off of Norfolk, VA in 1998 • Crew member entered 0 for a data value • Cascade of failures led to a failure of the propulsion system • Yorktown was dead in the water for a couple of hours

  13. Other Systems • FAA air traffic control system • IRS data management system • IBM “Microkernel” • “Sistem kilitlendi” • Many others, too numerous to list

  14. Summary • We do not have the necessary technologies and know-how to build robust computer systems • There is huge demand for people who deeply understand and can build robust systems

  15. Logistics • Lectures • MW 9:30-10:50, Engineering B15 • Instructor • Prof. Sirer, egs at systems.cs.cornell.edu • Office Hours • MW 11am – noon • Or by prior appointment • TAs • To be announced

  16. Communication • Course Web Page http://www.cs.cornell.edu/people/egs/comp303/ • Office hours, assignments, lectures, and other supplemental materials will be on the web site • This document will be linked in • Email • comp303 at systems.cs.cornell.edu • The email alias goes to me and the TAs, not to the whole class

  17. Administrative • Course has three components • Lectures and Readings • Homeworks and Exams • Projects • You are expected to keep up with all three

  18. Grading • Breakdown • 40% Projects (approx. 8 assignments) • 40% Prelims and Final (2 prelims, 1 final) • 15% Homeworks (approx. 6-10) • 5% Flexgrade (participation, attitude, improvement and effort) • Grading will not be done on a curve • It is my goal to be able to give everyone an A+ • Help me achieve this

  19. Projects • Projects will be done in two-person teams • You may indicate a desired partner • If they also indicate you, we will pair you up • If you don’t have a preferred partner, we’ll pair you up with someone suitable • Working in groups • Start early, time management is key • Manage the team effort • Part of what you are supposed to learn is how to manage to get work done in a small team

  20. Academic Integrity and Honor Code • All submitted work must be your own • All homeworks must be your own independent work • OK to study together • Cannot share solutions, ever • Project groups submit joint work • All group assignments must represent solely the work of the two people in that group • Cannot be in possession of someone else’s solution • Violations will be prosecuted to the fullest extent • Closed-book exams, no calculators

  21. Draft Syllabus • Introduction and Digital Design Review • From Switches, Through Transistors to Gates and Circuits • Karnaugh Map Minimization • State Bearing Elements • Flip-flops, Latches and State • Finite State Machines • Binary Arithmetic • Basic Processor Organization and the Fetch-Decode Cycle • Instruction Set Architectures, Intro to MIPS ISA • Arithmetic Logic Units • MIPS ISA • Assembly Language Programming • Procedures and Calling Conventions • Pipelining Principles, Hazards, Hazard Detection and Data Forwarding • Memory: Physical and Virtual, Page Tables, TLBs • Multilevel Caches, Cache-Conscious Programming • Of Privilege, Traps, Interrupts and Exceptions • Input/Output, Direct Memory Access • Disks. RAID • Multiple Cores, Concurrency and Critical Sections • Spin Locks, Semaphores, Monitors and Condition Variables • Advanced Processor Design – Out-of-order, Superpipelining, Superscalar, Simultaneous Multithreading

  22. Draft Project Plan • Basic ALU Implementation • Basic Execution Engine • MIPS Processor • Pipelined MIPS Processor • MIPS Disassembler • MIPS Simulator • Cache Simulation and Measurement • Multicore Simulator and Corewars!

  23. Questions? • And demographics…