1 / 11

Wind turbine for hurricane-prone regions

Wind turbine for hurricane-prone regions. Senior Design Team 12 : Chase Bryant Alexandra Callich Jonathan Meyer-Senior Elliot Popper Rayford Rahming Christian Scott. Problem Statement Develop a conventional wind turbine capable of surviving hurricane-force wind conditions.

ofira
Télécharger la présentation

Wind turbine for hurricane-prone regions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wind turbineforhurricane-prone regions Senior Design Team 12: Chase Bryant Alexandra Callich Jonathan Meyer-Senior Elliot Popper RayfordRahming Christian Scott

  2. Problem Statement Develop a conventional wind turbine capable of surviving hurricane-force wind conditions. Specifications • Capable of conventional turbine functionality • Capable of survival in hurricane force winds • Environmental-friendly • Economically feasible

  3. Our Design • Systems • Control System • Braking System Horizontal-Axis Turbine Foundation with Counterweight Wind Turbine

  4. Materials • All Parts Ordered! • Waiting on Shipment Anemometer Microcontroller Hydraulic Cylinder

  5. Located in Thomasville, GA. Southern Division focuses primarily on the Southeast Greg Orff – General Manager

  6. Setbacks • Steel Order • Turbine Blades Discontinued

  7. Structure

  8. Hydraulic System Cylinder Diameter = 1.5 inches Bore Diameter = 2.5 inches Pump and Motor Assembly Solenoid w/Remote Cord Set 1.4 GPM at 1,600 PSI 3 quart containment capacity

  9. Microcontroller Flow Chart

  10. Sustainable Engineered Solutions • Purchasing a trailer that will be Self Sustainable • FAMU-FSU COE is allocating land • Pursuing the possibilities on sharing land and joining our projects • Still exploring foundation options

  11. Expectations • Finding a location for permanent placement • Functional lowering mechanism • Power production • Estimated Completion Date: April 1, 2013 • Remainder of time for operating and testing the sytem

More Related