An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update on the AFP Project D. Macina D. Macina, LTEX

  2. AFP status • The project went through an ATLAS internal Review on September 17-18. The ATLAS recommendations have been to install all possible infrastructure during the LS1 to allow the installation of the movable beampipes and detectors in the Christmas shut-down 2015-2016. • During the LS1 we need to: • modify the vacuum layout between Q5 and Q6 on both sides of IP1 and prepare it for the movable beampipe installation in the Christmas shut-down 2015-2016. The appropriate ECR will be issued but in general we need to foresee dummy beampipes, possibly one sector valve and a couple of pumps • Install all cables for detectors, controls, beam and vacuum instrumentation • install the movable beam pipes supports • install all services related to cooling • foresee the installation of a TCL6 if necessary (see Stefano Redaelli’s talk) D. Macina, LTEX

  3. HPB functional design =valve=4 =BPM=5 =bellow=4 =secondary vacuum tank Injection position AFP1 dx=+10mm AFP2 dx=+10 mm Q6 Si + Timing Si ≈ Q5 TCL6? beam Data taking position AFP2 dx= -15 mm AFP1 dx= -15 mm Q5 Q6 ≈ Si Si + Timing TCL6? beam D. Macina, LTEX

  4. HBP impedance A new design has been submitted to the RF group to lower the HBP impedance below the 1% level of the whole LHC. We are waiting for the new calculation results 1200 mm 450 mm D. Macina, LTEX

  5. Next steps (until the end of the year) • Define the vacuum layout (dummy beampipes, pumps, valves and supports) and issue the ECR to allow the production of the pieces in time for installation in LS1 • Continue to work on the optimization of the design to improve the impedance • Order BPMs • Define final cable list • Define the cooling and related services once results for power losses with the new design are available • Vacuum tests on the pocket prototype by the end of December 2012 D. Macina, LTEX