TRACECA PROJECT EVALUATION

TRACECA PROJECT EVALUATION. PROJECT. Rehabilitation and Reconstruction of the Key Transit Highways Connecting the Centre of the Republic of Armenia to Georgia. The main goal and description of the Project.

olathe
Télécharger la présentation

TRACECA PROJECT EVALUATION

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TRACECA PROJECT EVALUATION

  2. PROJECT Rehabilitation and Reconstruction of the Key Transit Highways Connecting the Centre of the Republic of Armenia to Georgia

  3. The main goal and description of the Project The main goal of the project is to rehabilitate and reconstruct the key transit highways connecting the centre of the Republic of Armenia to Georgia. The implementation of the project will result in the safe traffic, reduction of road costs, increased efficiency of international cargo transportations in the road network of common use in the Republic of Armenia which will contribute to the development of the state economy.

  4. The Project involves the following key transit highways M3 Margara-Vanadzor-Tashir-Georgian border km 40+000 - km 128+200 section and km 176+900 - km 183+700 section. The total length of the road sections included in the project is 95.0 km. M4 Yerevan-Sevan-Ijevan-Azeri border km 10+400 - km 143+500 section. The total length of the road section included in the project is 133.1 km. 3. M6 Vanadzor-Alaverdi-Georgian border km 0+000 - km 91+000 section. The total length of the road section included in the project is 91 km. 4. M8 Vanadzor-Dilijan km 10+500 - km 42+000 section. The total length of the road section included in the project is 31.5 km. 5. M16 /M4/-Noyemberyan-/M6/ km 0+000 - km 59+000 section. The total length of the road section included in the project is 59.0 km.

  5. Gogavan (Republic of Armenia – border Georgia) Bagratashen (Republic of Armenia – border of Georgia) I. R M3 Margara-Vanadzor-Tashir-Georgian border, km 40+000 – km 128+200 (length of the section – 88.2 km) II. R M3 Margara-Vanadzor-Tashir-Georgian border, km 176+900 – km 183+700 (length of the section – 6.8 km) III. R M4 Yerevan-Sevan-Ijevan-Azeri border, km 10+400 – km 143+500 (length of the section – 133.1 km) IV. R M6 Vanadzor-Alaverdi-Georgian border, km 0+000 – km 91+000 (length of the section – 91.0 km) V. R M8 Vanadzor-Dilijan, km 10+500 – km 42+000 (length of the section – 31.5 km) VI. R M16 /M4/-Noyemberyan-/M6/, km 0+000 – km 59+000 (length of the section – 59.0 km) The preliminary study of the roads was conducted during the year of 2010 by the specialists of the “Armenian Roads Directorate” SNCO at the Ministry of Transport and Communication of Armenia.

  6. * - Including the 1st technical category

  7. The traffic intensivity was measured during 2010 by the specialists of the „Armenian Roads Directorate“ SNCO at the Ministry of Transport and Communication of Armenia. Below are the calculations for the traffic intensivity for each road section.

  8. Below are the results of the prefeasibility analysis Allocation of roads reconstruction and rehabilitation works per annum * - Including the I technical category

  9. THANK YOU!