This report outlines the current status and future schedule of the TBTS experimental area TB module prototype as of August 18, 2011. Key activities include ongoing assembly of components at Mecachrome, with notable items like RF structure mock-ups and alignment systems. Positioning tests are in progress, and the framework for thermal and transport tests is being developed for execution at CERN. Future assembly is set to begin mid-September 2011, ensuring a focused approach toward achieving project milestones.
E N D
Next structure for TBTS experimental area TB module prototype schedule G. Riddone, 18.08.2011
TBTS accelerating structures • At present TD24 • Future • TD24 with WFM x2 (3 under fabrication at Mecachrome via CEA-Saclay + 1 under adjudication, bonding at Thales): assembly will start mid of September 2011 • Fall back solution: T24 (ready) 20110818, G. Riddone
Two-beam module prototype - LAB Status • Positioning tests going on first two supporting/alignment systems • Pieces for RF structure mock-up received and under assembly • DB magnet and BPM mock-ups available • Equipment for thermal tests (foreseen at the end of this year) at CERN • Frame for transport tests under development Sequence of tests “0-0 modules” • Positioning/alignments tests • Assembly RF structures • Installation of RF structures,DB magnets and BPM mock-ups available • Thermal tests • Transport tests 20110818, G. Riddone
TB Module prototypes - LAB 20110818, G. Riddone
TB Module prototypes - CLEX 20110818, G. Riddone