An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CASCADEFrom Concept to Implementation SUR Division Meeting Brussels, 17 December 2007 Alex Wandels, Jörg Steinleitner, Sorin Muresean CASCADE Programme CASCADE & RFG - ASAS TN2 Seminar Jörg Steinleitner Paris, 14 April 2008 European Organisation for the Safety of Air Navigation

  2. CASCADE Scope • Ground Surveillance Applications (ADS-B Out) • In a non-radar environment • In a radar environment • On the airport surface • Airborne Derived Data 2008 ADS-B Receiver • Airborne Surveillance Applications (ADS-B In) • Situational awareness on the surface • Airborne situational awareness • Visual separation on approach • In Trail Procedure 2011 Situational Awareness “only”

  3. Going to Operations - what does it take? Avionics Aircrew Manual EASARegulation ADS-B-NRA Airworthiness Approval Operational Approval RFG SPR-INTEROP EC SES Regulation SPI-IR OPERATIONS wide-spread Business Case Simulations, Trials & Monitoring ANSP Operational Approval ATC Manual Ground Infrastructure PreliminarySafety Case

  4. Progress Trials 12 ANSPs 400+ aircraft 500,000 flights/year + GA

  5. ADS-B-NRAAirworthiness Approval Based on RFG ED126/DO303 Publication is imminent ! All Airbus families approved (on NPA basis) Boeing to follow soon (FAA approval) Acceptable Means of Compliance for Hudson Bay Implementation ! EASA AMC 20-24

  6. ADS-B Sites

  7. CRISTAL ITP Revenue Flights Flight Trial RTS From 80 nm to 20 nm

  8. Deployment in Europe – Timeline 2015 SES “Surveillance Performance & Interoperability (SPI IR)” Rulemaking Target for EC Adoption: 2009 voluntary implementation in pocket areas certified existing equipage • IR based implementation in wider areas • upgraded equipage

  9. Deployment in Europe – Avionics • Pioneer Phase (existing “opportunity” avionics): • Pocket implementations in Europe • Australia, Canada, USA (TBD) • “ADS-B out” mandate (avionics upgrade): • SES “SPI IR” • USA (Australia, Canada) NPRMs GNSS Receiver GNSS Receiver (SA Aware recommended) Alternative Wiring Direct Wiring “Data Collector” (e.g. IRU) Uncomp. Latency ~ 0.6s ~ 2015 Transponder: ED102/DO260 Transponder: ED102A/DO260A 2010 2009 RFG SPR/INTEROP SPI IR Transponder Baseline EASA AMCs SPI IR MoC ADS-B in (voluntarily)

  10. High-level RFG Planning Dec Dec Apr Aug Dec Apr Aug Dec Apr Aug VSA RAD ITP ADS-B-RADATSA-ITP ATSA-VSA ADS-B-RAD: Enhanced ATS in Radar Areas ATSA-ITP: In-trail Procedure in Oceanic Airspace ATSA-VSA: Enhanced Visual Separation on Approach ADS-B-APTATSA-AIRB ATSA-SURF ASPA-S&M ATSA-APT: Airport Surface Surveillance ATSA-AIRB: Enhanced TSA During Flight Operations ATSA-SURF: Enhanced TSA on the Airport Surface ASPA-S&M: Sequencing & Merging Operations 2008 2007 2009 ADS-B-NRA (ED-126, DO-303) Enhanced ATS in Non-Radar Areas TBD: ADS-B-ADD – Aircraft Derived Data for Ground Tools

  11. RFG/15 Feedback • ATSA-ITP currently under EUROCAE WC / RTCA FRAC • Bringing home ADS-B-RAD & ATSA-VSA: • SPR/INTEROP integration to commence ! • Final Safety Methodology – SMS & ESARR4 ! • S&M, SURF, AIRB – definition of scope: • ASPA-S&M: back on track, using FDMS feedback • ATSA-SURF: basic situational awareness, with “indications” TBD • ATSA-AIRB: chosen scenario – mixed AT/GA in class E airspace • ADS-B-APT to be closely coordinated with ATSA-SURF • Hard deadline: end 2009!

  12. RFG - what does it take? Serving near-term Implementation Cert & Regulation Feedback OPS & SYS Skills No open ends ! Breaking New Grounds A Great Team !!!

  13. ADS-B Performance: ADS-B-NRA & ADS-B-RADReported vs. Required Separation: 5NM 3NM 2.5NM ADS-B-RAD APP ADS-B-RAD TMA ADS-B-NRA & ADS-B-RAD ER • Sources: • ADS-B Monitoring Project • Pioneer Airlines Project (based on 100+ million samples) Integrity Bound: Systematic NUC=0 issue (1% !) Under investigation !

  14. ADS-B in other Continents NRA Hudson Bay Nov 08 later Greenland NRA+RAD Upper airspace 2012-2014-2018 RAD “all airspace” 2020

  15. “g4” International CoordinationEquipage Advice Advice Status

  16. Beyond CASCADE – “Package 1.5” • To fill the gap between CASCADE & Package 2 (AP23) • Enhanced ATSAW & Spacing Applications • “IOC” of 2013+ (part of SESAR IP2) • Implies changes to ATCO procedures & “ADS-B In” avionics • Same “ADS-B out” avionics baseline as for CASCADE • Eurocontrol: new activity proposed to Directors • “RFG 1.5” to start in 2010 • Application set to be defined in the meantime

  17. First “RFG 1.0” and then “RFG 1.5” “Let’s stick to our plan to put a man into orbit first … ” “… before we put one on the moon !”

  18. Conclusion ADS-B Implementation Is now ! Implementing Rules US and Europe: 2009 Significant role for RFG “Package 1.5” www.eurocontrol.int/cascade