CREAM CE Certification and Testing Overview from Academia Sinica and CERN Geneva (2008)

orlando-wolf avatar
7 diapositives · 230 Views · Nov 04, 2014

This document presents a comprehensive overview of the CREAM CE certification and testing process conducted by Academia Sinica in collaboration with CERN Geneva in 2008. It details the installation and configuration verification, stress testing results, and job submission statistics. Key findings include a functionality pass rate of over 99.5% during stress tests, though minor issues were encountered. The goal is to achieve production quality, with further testing planned once installation issues are resolved. A new CREAM CE patch is also in development.

CREAM CE Certification and Testing Overview from Academia Sinica and CERN Geneva (2008) - slide 1
01 / 7CREAM CE Certification and Testing Overview from Academia Sinica and CERN Geneva (2008)
1 / 17

Télécharger la présentation

CREAM CE Certification and Testing Overview from Academia Sinica and CERN Geneva (2008)
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. Di Qing SA3 Academia Sinica & CERN Geneva, 2008 CREAM CE Certification and Testing

  2. CREAM CE certification and testing - Qing Introduction • Goals • Verify installation and configuration • Pass normal certification procedures • 5 days unattended continuously stress test • 50 multiple users • Less than 0.5% failures • Patches • 1755, CREAM server • 1790, CREAM client • Test started at the end of May • The test scripts provided by INFN • One wiki page setup for test results • https://twiki.cern.ch/twiki/bin/view/EGEE/CREAMTest • CE checklist • https://twiki.cern.ch/twiki/bin/view/EGEE/CECheckList

  3. CREAM CE certification and testing - Qing Testbed setup • One separated Torque server • BLParser server installed there by hand • 11 WNs • 110 Virtual CPUs • One UI • One physical CREAM CE for stress testing • 4 2.2 GHz cores • 4GB memory • One CREAM CE for installation and configuration test

  4. CREAM CE certification and testing - Qing Test performed • Installation and configuration • Followed the formal installation procedure, specially check the package dependency • Tested different installation scenario • Configured it by YAIM • Basic functionalities • Submission through CLI, job status check, delegate proxy etc. • Stress testing • Submission through CLI • 9800 jobs per day with 49 users • Jobs accumulated in queues as fast as possible

  5. CREAM CE certification and testing - Qing Test results • Basic functionality tests passed • Dependency missing on some packages • tomcat, mysql-server and mysql-connector-java • Configuration issues • Configurations of BLPaser server and blah • LCAS and LCMAPS generate too many logs • Issue with the upgrade of Glexec • fixed • Other issues • Need to restart tomcat if CAs are updated • problems in trustmanager • too many files left under the home directories of pool accounts • Authentication fails with new type of VO attributes in VOMS proxy • fixed

  6. CREAM CE certification and testing - Qing Stress test results • System load • CPU load is quite low, even less than 1 for most of time, only when submitting massive jobs to cream CE, it can reach 9 • Memory usage is low too, less than 2GB • Disk usage can increase • Can be solved by purging jobs and limiting the log level of services • Job submission • Job submission to CREAM CE can fail • Happened in last two days test, even more than 3% of jobs could not be submitted • Job success rate • More than 99.5% jobs succeeded in 6 of 10 days test • The worst failure rate is about 9.5% • Most of failures only give error message, “blah error”

  7. CREAM CE certification and testing - Qing Conclusion • Still need more works to reach production quality • We never reached 5 days unattended continuously stress test with less than 0.5% failure rate on certification testbed • Now can be released to PPS for users to test and get some experiences after sorting out the installation and configuration issues • In principle, it can be done today • The tests have been done only by CREAM CLI • Tests through WMS will be done when ICE is ready • A recipe on how to setup a WMS plus ICE is available • A new CREAM CE patch is in preparation for certification