An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Verification Matrix to the technicalspecificationsNaples, November the 9th, 2012 Guillaume Prévôt EUSO-BALLOON, 9th progress Meeting 2012

  2. Verification Matrix to the technicalspecifications • The verification of the product allows to verify the respect of the technical requirements. The verification matrix to the requirements presents all the tests and/or simulations that allow to verify the performances of EUSO Balloon instrument and its components. • The functional and performance requirements relative to the design and manufacturing of the EUSO BALLOON instrument are described in details in EUSO- TS-INST-206-LAL_V2. • The EUSO BALLOON Instrument expected to fulfill the mission requirements is described in the EUSO-DF-INST-204-LAL_V2. EUSO-BALLOON, 9th progress Meeting 2012

  3. Verification Matrix to the technicalspecifications • The characteristic of the verification matrix to the requierements can be : • T : Test • I : Inspection • D : Design • AN : Analysis • OTH : Other • We note C for conform, PC for partially conform, and NC for not conform. EUSO-BALLOON, 9th progress Meeting 2012

  4. EUSO-BALLOON, 9th progress Meeting 2012