An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Barrel TRT Straw Leak Test K. McFarlane Hampton University DOE/NSF Review, BNL March 2001

  2. Straw Leak Test Status • Running now with 2-straw partially automated system • Can reliably get 125 straws/day (target) • New 4-straw system is under construction (in use April 2001) • Automation of additional steps is being developed • Basic leak test technology is unchanged. K. McFarlane BNL, 20-Mar to 22-Mar, 2001

  3. Leak Test Station K. McFarlane BNL, 20-Mar to 22-Mar, 2001

  4. Leak Test ‘Head’ K. McFarlane BNL, 20-Mar to 22-Mar, 2001

  5. Straw Leak Test Criterion • Straw is re-tested if leak rate exceeds 0.020” water in 20 s (0.7 mbar/bar/min; cf. TDR specification of 0.1 mbar/bar/min) • Straw that fails three times is rejected. • Typical re-test results are: 0.004, 0.001, 0.010, 0.002”. • Leak rate is usually a function of our machine. We do not plan to change. K. McFarlane BNL, 20-Mar to 22-Mar, 2001

  6. Leak Test Partial Automation Partial automation – BridgeView front panel K. McFarlane BNL, 20-Mar to 22-Mar, 2001

  7. Database Entry K. McFarlane BNL, 20-Mar to 22-Mar, 2001

  8. New Leak Test ‘Head’ K. McFarlane BNL, 20-Mar to 22-Mar, 2001

  9. Conclusions • Leak check criterion is satisfactory; upgrade of equipment will proceed on the basis that existing basic method works • Production rate now adequate; expected to increase, releasing technician time for other work. K. McFarlane BNL, 20-Mar to 22-Mar, 2001