An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    3. List of Customers Williston Basin

    4. Services Directional Drilling MWD/Gamma MWD – Un Manned Vertical Motors (3rd Party)

    5. Why Un-Manned MWD in Vertical Section? Faster Drilling Time No Lost time Running Slickline/Single Shot Running Gyro to find out where the hole is Better Control of Hole Constant Toolface More Survey Points Benefit of taking a Survey every Connection if needed Straighter Hole Ability to correct any Deviation Less Doglegs Less Casing Problems Less problems Running Casing in Straighter hole Less Casing Wear in Vertical Section while drilling Laterals Cost Savings

    6. Why Un-Manned MWD in Vertical Section? Cost Savings MWD Hands duration of Job Perdiem for MWD Hands Chance of running Single Shot and not getting Survey + Rig Time (Time & Cost) Running a Gyro Survey after Vertical Section has been drilled Nearly ½ the cost of Manned MWD

    7. Un-Manned MWD Procedures Rig-up & test tool on surface Pick and insert in Non-Mag-Align w/Motor Surface Test @ 500’ Trip to Bottom Train all Crews (Drillers, Toolpusher & Company Rep) Steps to taking Surveys. Usually 1-2 days. MWD Tech will be in area if needed for any problems or needs: Further Training Re-align tool to new motor Tool problems End of Job Tech will collect & download all data from tool along with Handwritten Survey Shot Sheet filled in by Rig of all shots taken by them. Survey will be QC & Filed w/State

    8. Pilot MWD System Specifications:

    9. Pilot MWD Rig Floor Display Windows Based Touch Screen Wireless two-way communication