SharePoint-Powered Project Management

DESCRIPTION

This case study discusses how Netrix LLC leveraged SharePoint's out-of-the-box capabilities to enhance project management in a large international telecom company. Facing challenges such as contractor skills mismatches and limited management visibility, the implementation aimed to simplify complex processes, enhance real-time reporting, and support field staff working offline. By utilizing existing SharePoint functionalities and promoting a cohesive project management approach, Netrix navigated obstacles effectively, resulting in improved efficiency and reduced project delays.

1 / 20

Télécharger la présentation

SharePoint-Powered Project Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SharePoint-Powered Project Management ANetrix Case Study about Using OOTB SharePoint Mark E. Vogt

  2. About Netrix LLC… • Netrix provides: • Cage-to-Cloud Infrastructure • Desktop-to-Mobile Applications • Carrier-to-Endpoint Communications • Network-to-Application Security • Expert SharePoint Technology Services and Solutions • Tailored Business Solutions • Engineering Expertise to Design, Deploy and Manage ALL • of your technology needs – we make it ALL work together • Why Customers Choose Netrix for SharePoint Solutions • More than 30 cumulative years of hands-on SharePoint experience • More than 70 cumulative years of IT & Business Solutions experience in leadership • Comprehensive capabilities from analysis through implementation & support • Focus on customer satisfaction and service excellence • The Netrix Guarantee

  3. Case Study Outline… Background • Description • History Challenge • Pain • Consequences • Requirements Solution • Why SharePoint? • Strengths • Weaknesses • Approach Results/Lessons

  4. Background… • Major International Telecom (150,000 employees) • Operates own (smaller) consulting firm (350 staff) • Same characteristics as many companies small & large: • Wide range of project sizes • Microscopic: 1 location with 5 phones • Boil-the-Ocean: 987 locations across USA with 75,000 phones • Wide range of project methodologies employed • Project teams often geographically-dispersed • Project teams often composed of (temporary) contractors • Project involve complex, dynamic (changing) processes

  5. Challenge… Pain • Staff comprised of contractors skilled in telecom but NOT project methodology • Project teams regularly re-organizing – no familiarity • Project staff continually in a state of ambiguity – actually didn’t know what to do • Project processes evolve/change rapidly – no time to re-train • Time spent training processes to contractors is time wasted – they leave • Management visibility into status (good & bad) difficult at best • No time for traditional update/distill style of reporting • Existing SP2010 site collections constrained to 5 GB by policy • Existing SP2010 policies prohibit custom (VS2012) solutions • Project teams in-the-field often spend all day not connected Consequences • Processes need to be repeated because latest one not followed • Project teams spend excessive amounts of time reporting • Time spent training & re-training is time (cost) wasted • Projects use other less-powerful technologies (Email, file servers) to avoid 5 GB limit • Sub-projects begin to falter; super-projects as a whole begins to suffer This pain multiplied across hundreds of concurrent projects is serious…

  6. Requirements… Must-Haves • Single common approach to project management • Process-related intelligence embedded in technology, notpeople • Make executing complex, dynamic processes as simple as tell-me-what-to-do • Store all content in SharePoint…without exceeding the 5 GB threshold • Enable field staff to work offline for most of day • Make it easy for staff to report exceptions • Make it easy for managers to detectexceptions • Make it easy to know when a sub-project is actually completed

  7. Approach… • Leverage OOTB components • Offload storage to Enterprise Vault™ as RBS (gaining in popularity) • Model complex project processes as content types • Capture &Track instances of processes in lists (not hidden inside SharePoint) • Employ multiple less-complex WFs to model these complex process • Delegate & Distribute development even with The Client

  8. Solution… Why SharePoint? • Strengths • Client already owns – just needs to use effectively • Most all functionality required already OOTB (functionality) • Functionality required already integrated (functionality) • Website-based; allows intranet & extranet solutions (accessibility) • Workflows possible… and permissible (functionality) • Enables both event-driven and schedule-driven automation (functionality) • Enables delegated & distributed development model (extensibility) • Possesses robust, feature-filled security (security) • Modular re: roles & services (performance) • Weaknesses • Oft-times “idiosyncratic” • SharePoint Designer workflows take care to make debug-able and “inheritable” UPSHOT: There are precious-few reasons to not use SharePoint…

  9. Solution… • Single SP2010 site collection • Single custom project site template • Custom project management-relevant content types (dovetail into larger parent taxonomy) • Content Types mirror methodology • Key processes as content types • Multiple Workplan extract via MSP-SP feed • Dashboards created via DataView web parts • Versioning enabled, limited to 3 versions • Remote BLOB Storage via Enterprise Vault ™ technology (already in-use) • Daily build-up of content typically ~ 100 MB/day • Nightly archiving offloads content to EV “Vault” DB • Leaves only tiny (50 Byte) links behind in SharePoint • SharePoint thinks it holds the content… but it doesn’t • Key Processes modeled first simple, then more complex • Processes manifested as (visible) list items • Numerous smaller manageable WFs (“robots”) work in symphony • Overall solution is inheritable and extensible • Partial process automation, full process management automation Ablend of manual & automated elements is often The Elegant Solution…

  10. Solution: Landing Page… • Project Overview/Status • Project Announcements • Project Calendar • Project Goals • Project Issues • Project Risks • Project Decisions • Project Questions • Project Snippets • Business Needs (or User Stories) • Solution Requirements • Project Tasks • Project Tests • Project Defects • Project Documents ORDER lists to reflect methodology… DISPLAY only lists relevant to current project phase… DISPLAY “Landing Page View” of each list… Seemingly vast Landing Pages swiftly become invaluable to busy project members seeking information…

  11. Solution: Processes-as-Items… Process Workflow(s) Task Workflows Library Workflows • Process-as-item metaphor enables “State Machine” Workflow • Projects involving repeated, complex processes can be readily tracked • Complex processes can be automated in smaller, re-usable WFs • Complex processes can be partially automated, but the overall management fully automated • Numerous people can “feed” these items (unlike MPP files) • Numerous documents (deliverables) can be involved in a single process • Numerous stages can be readily tracked • Numerous criteria for completion can be readily & intuitively tracked • The website contains (retains) the process – freeing the workers to work! • Manifesting Key Project Processes as content types in lists sets the stage for “embedding” methodology – freeing workers to work…

  12. Solution: Workflows… • Approach: • Daily numerous smaller, • manageable WFs monitored • key processes, And emailed • out explicitinstructions to each project member – even clients. • Results: • Ambiguity virtually eliminated • Workers perfected only 2 “plays”: • PROCESS email • WORK the site • Client could “inherit” solution • Client could “evolve” solution PM CLIENT FE DE Process Management automation can be just as useful as process automation… PE

  13. Solution: Workflows… Challenge: Typically SPD Workflows (Declarative) can only be triggered when an item is created and/or changed. Triggering SPD Workflows to run on a scheduled basis requires a custom timer job… …but Custom timer jobs were NOT permitted, due to organization development capability Useful Workaround: Leverage the nightly timer jobs(2) already built-into the Information Management Feature! Created a retention stage which repeated a selected “Nightly Item Inspection” WF daily, startingimmediately after creation  … With both event-triggered and scheduled WFs, much is possible…

  14. Solution: Content Types… • System • Item • ABCItem • ABCProjectItem • ABCProject • ABCProjectGoal • ABCProjectRisk • ABCProjectIssue • ABCBusinessNeed • ABCSolutionRequirement • ABCSolutionStory • ABCProjectProcess1 • ABCProjectTask • ABCSolutionTest • ABCSolutionDefect • ABCSolutionEnhancement • … • Document • ABCDocument • ABCProjectDocument • NOTES: • NEVER (ever) modified SharePoint’s built-in content types! • USED content types instead of “item” in lists • DEFINED site content types at the site collection level • DIDN’T over-solve needs • PLANNED for future via placeholder/abstractcontent types • SUBCLASSED document content types only when needed! • Item • Title [single line text] • ABCItem • Description [multi-line text] • Priority [A, B, C] • Condition [Green, Yellow, Red] • Notes [multi-line text] • ABCTask • %Complete [number, 0-1, %] • %CompleteBar [Calculated; = REPT(“*”, 10*(%Complete) )] • Status [Queued, Started, Pending, Completed, Deferred, Cancelled ] • ABCProjectTask • Client [lookup OR managed metadata] • Program [lookup OR managed metadata] • Project [lookup OR managed metadata] USEFUL! Just a few content types can be very effective for project management…

  15. Solution: Project Dashboard… Managers used dashboard to detect & resolve exceptions Lesson: dashboards needn’t be fancy to be effective…

  16. Solution: Check-out with local draft… Project staff who knew they were going off-site would simply check-out a document in local draft mode… This would allow them to carry and work on a document while offline, continually saving to this local copy… When next connected, SharePoint would synchronize these changes back into the associated SharePoint library! Sometimes the simplest of techniques end up being The Elegant Solution…

  17. Results… • Project member had only 2 simple, unchanging “plays” to learn: • PROCESS Inbox daily • WORK the site • Project members received explicit emails telling them what to do daily • Project Ambiguity greatly minimized • Project teams could re-organize with minimal loss of productivity • Processes could evolve/change daily with minimal impact • Project members easily fed process statuses into natural, intuitive lists • List WFs immediately informed PMs and other members of issues • List WFs fed PM dashboards for improved exception detection & response • Email usage (content sharing) reducedsignificantly • File Server usage reducedsignificantly • Project staff could work disconnected effectively • Production environment constraints were respected (played by the rules)

  18. Lessons... • Project Management is all about Collaboration • SharePoint was built for Collaboration • Collaboration is only partly “communicating” • Collaboration is only partly “sharing” • Collaboration is mostly “tasking” • Success does not require perfection • Complete process automation is not always achievable – but process management automation is • Process Management automation can be just as valuable as automating the process itself • Seek solutions which distribute & delegate development • Seek solutions which are intuitive & inheritable for clients SharePoint-powered project management can be very effective…(you simply need to be working with people who can show you how)

  19. Discussion…

  20. Netrix’s Team SharePoint… • Kirk Fallbacher – Director, Software Group • Dave Durbin – Manager, SharePoint Practice • Team SharePoint Netrix LLC 2801 Lakeside Drive Bannockburn, IL 60015 USA • SharePoint@NetrixLLC.com