110 likes | 430 Vues
TI Rips into High-Speed Encoding with up to 16X Recording for High-End Consumer Audio. Vineet Ganju Performance Audio Marketing Manager. High-Speed Encoding Addresses Trends in CE and Automotive Markets. Home Media Servers, HDD based stereo systems, High Speed CD rippers.
E N D
TI Rips into High-Speed Encoding with up to 16X Recording for High-End Consumer Audio Vineet Ganju Performance Audio Marketing Manager
High-Speed Encoding Addresses Trends in CE and Automotive Markets • Home Media Servers, HDD based stereo systems, High Speed CD rippers • Growing variety of consumer equipment capable of audio storage • Need to be able to rip music quickly without the complexity of a PC • Need low-cost, consumer equipment price points • Navigation, Multimedia Systems, Virtual CD changers and A/V Foundation Systems • HDD in navigation systems used as audio storage • Eliminate mechanical CD changers with NAND • Need to playback from other than radio/CD (USB, SD/MMC) • CD Ripping needs to be quick and transparent
High-Speed Encoding Market Needs • End User Experience • Users don’t want to spend a long time ripping CDs • System should be usable for other functions while ripping • Cost-effective System • Needs to be cost-effective versus a PC-based system • Needs to hit consumer price points • Design Flexibility • Design final product from menu of hardware interface options • Design final product from menu of software algorithms • Time to market • Growing and evolving consumer/automotive encoder market • Need to get products out quickly to capitalize on current trends
TI’s New High Speed Encoding System Solution • Leverages TI’s expertise in AVR and automotive audio markets • Solid foundation in multi-channel decoders for CE and automotive markets • Home audio solutions becoming central driver of home media experience • High Speed Encodesolution improves end user experience • Fast transfer from CD to storage with up to 20X ripping speeds • Simultaneous encode and decode enables listening while ripping • Consumer price points • DSP manages all the interfaces eliminating microcontroller cost • Single DSP for encode and decode reduces chip count • Modular, scalable solution allows tailoring to meet cost target • Design flexibility • Supports choice of popular encode formats including MP3, WMA, ATRAC3, and AAC • Interface to CD, USB, HDD, NAND, Disk-On-Chip and others • Time to market • Drivers, encoders, decoders, and system software included as part of the solution • High Speed Encode EVM is a full prototype system • 3rd party Mistral helps speed design and customization
Rip Audio QuicklyStore a 60min CD in 3min with ATRAC3 Encoder Speed Benchmarks • DA710 @ 300MHz – Encode Only 0 5x 10x 15x • MP3 Encoder (128kbps/44.1kHz/stereo) MP3 12x • WMA Encoder (128kbps/44.1kHz/stereo) WMA 12x • ATRAC3 Encoder ATRAC3 20x • ATRAC-Plus Encoder ATRAC-Plus 12x AAC • MPEG2 AAC LC Encoder 12x
Enhancing User Experience While Reducing System Cost Enhanced user experience: • Simultaneous encode and decode enables listening to audio while ripping. System cost reduction • DSP controls interfaces eliminating microcontroller cost • Single DSP for encode and decode EXTERNAL STORAGE SDRAM TMS320DA710 Nand Flash Up to 20x CD ripping Host Micro / Head Unit I2C Communication HDD Encode MEDIA SOURCE ATAPI CD Loader Data Serial CD Loader USB OTG Controller USB CTL PLAYBACK SD Card McASP* Audio Data Output (DAC) Radio McASP Decode DVD Player Audio Data Output (DAC) * Multi-channel Audio Serial Port
Modular System DesignCan be tailored to meet cost target EMIF connector 64MB SDRAM 8MB FLASH 512MB NAND 2GB MDOC USB OTG USB Host USB Slave DA710 Connector UHPI EMIF SD/MMC socket SPI1 I2C connector I2C0 / SPI0 Serial CD I2C1 20GB HDD MCASPs 6 ch ADC PCM1803ADB ATAPI CD Analog Voice PCM1803ADB CPLD Analog Radio PCM1803ADB 6 ch DAC PCM1606E DIT connector (SPDIF) DIR AK4112B DAC PCM1716E
Comprehensive Software Solution Speeds Time To Market CUSTOMIZATION Standard XDAIS algorithm interface allows easy integration of value-added, differentiating features Algos Custom AUDIO ALGORITHMS Comprehensive list of optimized audio decode, encode, post processing and I/O algorithm implementations Audio F/W FRAMEWORK + SYS S/W Enables high quality, complete audio system while delivering flexible design platform System S/W DA7XX AureusTM AUDIO DSP Scalable Family of Audio DSPs maximizes design reuse and reduces development costs Silicon
High Speed Encoder EVM System Prototype Speeds Time To Market Hardware For home music server and other high speed ripping end equipment • 300MHz DA710 DSP • 1 S/PDIF digital input/output. • 6 channel analog input/output • Support for USB OTG • 2.5” HDD with 20GB storage • Serial and ATAPI CD support • SD/MMC socket • Supports SDRAM/NOR/NAND/Disk-On-Chip • Hardware customization available from Mistral Software Available Today • Performance Audio Framework includes system software including drivers. • Encoders/Decoders/Post processing algorithms • File management/FAT file system • Software customization available from Mistral MistralDesign customization and integration also available
WMA Pro Dec 2.0 2.0 ENCODER WMA Encoder Pro ENCODER Leveraging TI Experience in Multichannel Market Available Coming soon DECODER Compress Audio DECODER TI DSD to PCM Decoder MPEG4 AAC DECODER TI-MPEG4 AAC ENCODER ATRAC3 PLUS DECODER TI ASRC Asynchronous SRC WMA Decoder Creator Post Processing TI Room Setup TI Effect Library Compress Audio ENCODER TI Filter Library ATRAC3 PLUS ENCODER Plan… Available from the 3rd party Available in ROM1 AAC+ Neural XM ** TI Room EQ MPEG2 AAC ENCODER ** Other ** Available from TI 3rd parties