1 / 6

DCP Meeting 12/09/12

DCP Meeting 12/09/12. Schedule for the technical of September 2012. ALICE. Additional jobs: Study for replace the tanks of TRD & TPC Feec , and check the possibility to use the mixed water on SSD/SDD. CMS.

ovid
Télécharger la présentation

DCP Meeting 12/09/12

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DCP Meeting12/09/12 Schedule for the technical of September 2012 O.Crespo-Lopez

  2. ALICE Additional jobs: Study for replace the tanks of TRD & TPC Feec, and check the possibility to use the mixed water on SSD/SDD O.Crespo-Lopez

  3. CMS Additional jobs: Study for the modifications of the brine & for the electrical cabinets with EN/MME & the draftsmen's O.Crespo-Lopez

  4. ATLAS O.Crespo-Lopez

  5. LHCB Additional jobs: Study for the upgrade of IT & TT O.Crespo-Lopez

  6. LS1 Schedule • For the Schedule of the LS1 we are waiting the planning of CV/OP in view to try to do the maintenance and the works in the same time in view to disturb at the minimum the using of the systems. • As soon as we have something, we will see with the differentstechnicals coordinators O.Crespo-Lopez

More Related