Windsor Utilities Commission Capital Plan Overview and Water System Renewal Strategy

The Windsor Utilities Commission (WUC) initiated a capital program based on a watermain study in 2002, expanded in 2007 to encompass all water assets. This program aims to address end-of-life issues and has smoothed investments of $20 million over 20 years to match funding needs with revenue. Recent investments have led to system improvements, reducing breaks and non-revenue water, though WUC still exceeds the provincial averages for these metrics. The proposed 2013 capital budget is $19.6 million, with an $18.2 million forecast for water infrastructure improvements.

owen-brewer
Télécharger la présentation

Windsor Utilities Commission Capital Plan Overview and Water System Renewal Strategy

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Windsor Utilities Commission Capital Plan

  2. Norbert Poggio Engineering Director Enwin Water Operations

  3. Background • Capital program based on the state of watermain study initiated in 2002. It was later expanded to a more comprehensive study which included all water assets in 2007 and updated in 2009. • Program was adjusted to “smooth” out the investment requirements while addressing “end-of-life” issues • “Smoothed” investment of $20.0 million over 20 year timeframe • Investment needs to be matched by revenues • The investments made over the past 5 years are demonstrating system improvements as evidenced by a reduction in breaks and non-revenue water compared to our peer group in Ontario • While there have been dramatic improvements, WUC still experiences higher than the provincial average for both breaks per 100km of installed pipe and non-revenue water

  4. WUC Capital Spend

  5. Proposed System Renewal Program

  6. Capital Breakout 2013 • Total 2013 consolidated WUC capital budget is $19.6M • Water capital forecast stands at $18.2M which is a $1.6M increase from 2012

  7. Proposed 2013 Watermain Program

  8. Proposed 2013 Renewal Program