1 / 16

The Main Contents

The Main Contents. Sealing and Marking of Bids Deadline for Submission of Bids Late Bids Withdrawal, Substitution and Modification of Bids Bid Opening. Words and Expressions. submission n 提交,提出;意见 Deadline for Submission of Bids 投标文件提交的截止时间 Submission and Opening of Bids

pcaldwell
Télécharger la présentation

The Main Contents

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Main Contents Sealing and Marking of Bids Deadline for Submission of Bids Late Bids Withdrawal, Substitution and Modification of Bids Bid Opening

  2. Words and Expressions submission n 提交,提出;意见 Deadline for Submission of Bids 投标文件提交的截止时间 Submission and Opening of Bids 投标文件的提交和开标 seal vt 密封,封闭,盖印,盖章 in separate sealed envelopes 单独包装

  3. enclose vt 放入封套,装入;围绕 Bear 注明 duly adv 正当地,适当地;及时地,按时地 duly marking 正确标明 misplacement n 误放,错位;遗忘 premature adj 过早的,草率的;早熟的,不成熟的 deadline n 限期,截止时间

  4. Late Bids 迟交的投标文件 amend vt 修改 withdrawal n 撤退,退回,撤消;提款 be subject to 受…支配,从属于 substitution n 代替,替换 accompany vt 陪伴,伴随,补充;为...伴奏 interval n 间隔,间歇;距离 designate vi 指定,表明;选派,任命

  5. English-Chinese translation • opening of bids 开标 • sealing and marking of bids • 投标文件的密封和标记 • deadline for submission of bids • 投标文件提交的截止时间 • withdrawal, substitution and modification of bids • 投标文件的撤回、替换与修改 • the bidders’ representatives • 与会的投标人

  6. 6. the respective envelopes 在各自的密封袋上 7. the misplacement or premature opening of the bid 错放和开封投标文件 8. the specific identification of this bidding process 工程项目编号 9. as a minimum 至少 10. the Bid Price 投标报价

  7. Key Structures The Employer may extend the deadline for the submission of bids by amending the Bidding Document, in which case all rights and obligations of the Employer and Bidders previously subject to the deadline shall thereafter be subject to the deadline as extended. 招标人可以发出补遗书,酌情延长提交投标文件的截止时间。在此情况下,招投标双方在原投标截止时间方面的所有权利和义务将适用于延长后新的投标截止时间。 本句中的in which case…引导定语从句,意为“在此情况下…”。

  8. The Employer shall open the bids in public in the presence of Bidders` designated representatives at the address, date and time specified in the Bidding Document. 招标人按招标文件规定的时间和地点在投标人指定代表出席的情况下公开开标。 open the bids in public:公开开标 the Bidding Document: 招标文件 specified in the Bidding Document为后置定语,修饰名词“address, date and time”,。

  9. All other envelopes shall be opened one at a time, reading out: the name of the Bidder; the Bid Price; the presence of a bid security and any other details as the Employer may consider. 所有其它的投标文件应依次被拆封,并宣读投标人的名称、投标报价、是否提交了投标保证金和招标人认为适宜的其它细节。 one at a time:依次,一个个 a bid security:投标保证金 as the Employer may consider为定语从句,修饰名词details。

  10. Comprehension Exercises 1. What shall be written on the inner and outer envelopes? (a)bear the name and address of the Bidder; (b)be addressed to the Employer; (c)bear the specific identification of this bidding process; and (d)bear a warning not to open before the time and date for bid opening.

  11. 2. How does the Employer deal with the late bids? The Employer shall not consider any bid that arrives after the deadline for submission of bids. Any bid received by the Employer after the deadline for submission of bids shall be rejected and returned unopened to the Bidder.

  12. 3. Shall a bidder be permitted to withdraw, substitute or modify his bid at any time? No bid may be withdrawn, substituted, or modified in the interval between the deadline for submission of bids and the expiration of the period of bid validity.

  13. 4. What is the procedure of bid opening? First, envelopes marked “Withdrawal” shall be opened and read out and the envelope with the corresponding bid shall not be opened, but returned to the Bidder. Next, envelopes marked “Substitution” shall be opened and read out and exchanged with the corresponding bid being substituted, and the substituted bid shall not be opened, but returned to the Bidder. Envelopes marked “Modification” shall be opened and read out with the corresponding bid. Only envelopes that are opened and read out at bid opening shall be considered further.All other envelopes shall be opened one at a time, reading out: the name of the Bidder; the Bid Price;

  14. 5. What shall the record of the bid opening include that prepared by the Employer? the name of the Bidder and whether there is a withdrawal, substitution, or modification; the Bid Price; and the presence or absence of a bid security.

  15. Reading Material Award of Contract 授予合同 Award Criteria 颁发标准 Notification of Award 中标通知 Prior to 在……之前 UNDB 联合国发展商务(联合国的出版物) dgMarket 一个专业的投标招标和采购的门户网站,它为您带来来自国际发展银行和世界各地政府机构的投标招标及采购机会。

  16. Performance Security 履约保证 ITB(Invitation To Bid)邀标 Annex to 附加 Forfeiture 没收

More Related