FRCC Planning Timeline

FRCC Planning Timeline. FRCC Annual Regional Transmission Planning Cycle. FRCC Long Range Study Starts. Plan Modified for CEERTS (Tentative). FRCC Annual Plan Publish. Plan Modified for CEERTS (Final). Technical Review (Long Range Study). New CEERTS Project Proposed (by June 1).

peggy
Télécharger la présentation

FRCC Planning Timeline

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FRCC Planning Timeline FRCC Annual Regional Transmission Planning Cycle FRCC Long Range Study Starts Plan Modified for CEERTS (Tentative) FRCC Annual Plan Publish Plan Modified for CEERTS (Final) Technical Review (Long Range Study) New CEERTS Project Proposed (by June 1) Technical Review (CEERTS) Benefit Review Developer Selection & Contracts FRCC New CEERTS Project Planning Cycle • Note: • FRCC must develop a Transmission Plan each year, and the plan is issued at the end of the technical review • New CEERTS projects are evaluated along with the roll up submittals • CEERTS projects have extra steps and the plan is modified to include them when the steps are completed

More Related