1 / 3

Summer work schedule

Summer work schedule. The following is a rough first-blush pass at a schedule for summer work on the P0D Work includes: Fabrication of required equipment beginning essentially immediately Opening magnet beginning July 2 3-week post-opening water target checkout

pillan
Télécharger la présentation

Summer work schedule

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Summer work schedule • The following is a rough first-blush pass at a schedule for summer work on the P0D • Work includes: • Fabrication of required equipment beginning essentially immediately • Opening magnet beginning July 2 • 3-week post-opening water target checkout • CWT disconnecting & prep July 13 – July 27 • CWT lifting beginning August 13 • Bladder replacement complete August 20 • 3-week post-replacement water target checkout • New drip pans & dry air covers installed September14 • P0D repair complete September 17

  2. Work at CSU

  3. Work at J-PARC Assumptions: Magnet begins opening July 2 “Beneficial occupancy” July 9 Project complete September 17

More Related