1 / 10

Work packages and early schedule

Work packages and early schedule. WP1 - Mechanical design 6 JB Daban -F Fressin -F Valbousquet -K Agabi -OCA groupe projet -LUAN groupe projet Design of telescope tube structure, telescope to mount fixation Early discussion on design with groupe projet (Sep ? Oct ?):

Télécharger la présentation

Work packages and early schedule

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Work packages and early schedule • WP1 - Mechanical design • 6 JB Daban • -F Fressin • -F Valbousquet • -K Agabi • -OCA groupe projet • -LUAN groupe projet • Design of telescope tube structure, telescope to mount fixation • Early discussion on design with groupe projet (Sep ? Oct ?): Karim, JB, Franck: list of needed specifications – Heike Anders, Frederic tolerance on changes on PSF shapes for image substraction • Choice of the telescope size to be done according to telescope mount at the end of October and realisation

  2. Work packages and early schedule • WP2 - Telescope and Camera software • -A Klotz • -A Blazit • -C Combier • -K Agabi – organizing discussion • -A le Van Suu • -C Carol • Study of telescope guiding and tracking software and camera reading. Computer interfaces/redundancy/security • Meeting between LUAN and OHP teams soon (Sep ? Oct ?) to fix which software can be reused/adapted for A STEP

  3. Work packages and early schedule • WP-3 Camera thermal enclosure design and tests/ filter and field corrections – > subcategory of WP-1 • -A Blazit • -JB Daban • -F Jeanneaux • -Y Fantei • -F Fressin • -K Agabi • Design of enclosure for camera / wynne corrector /filter or dichroïc, fixation on telesope tube

  4. Work packages and early schedule • WP-4 Optical combination – Camera tests • A Blazit V • P Assus • F Fressin • A Erikson + F Pont in reaction mode – F Valbousquet real input • Zeemax simulations of the field – PSF shapes on every part of the field.

  5. Work packages and early schedule • WP-5 - 2007 campaign tests • -D Mekarnia V • -FX Schmider • -E Fossat • K Agabi + F Valbousquet V + V : optical experiments – small mirrors including tulip mirror in zerodur September • Logistic needs for A STEP : to be defined for September 11 • Checking the availability of new “optical experiments” site at Dome C, or preparing A STEP for Concordiastro site • Testing specific treatment on zerodur mirror at different places – behaviour of frost - optical behaviour of mirrors Foucault test • What do we send at Dome C in 2 months ? • Additional tests on Astro 1200 ? Different payloads ?

  6. Work packages and early schedule • WP-6 Dome C specific problems: open questions that require study groups • - Karim V • How to do flat fields at Dome C ? Mandatory for good photometric precision – frequency needed ? • Necessity of a protection for bad condition days/summer ? Availability of “flower domes” ? • Electrical problems/overcharges – all electronic control • Duplication ? Of camera ? Encoder (mount) Control computer • Who will run A STEP in 2007 ?

  7. Work packages and early schedule • WP–7 Data pipeline – Light curves extraction and analysis • -H Rauer V • -A Erikson • -F Pont • -T Guillot • -FX Scmider • -F Fressin • What is reused from BEST data pipeline ? Design of the alarm mode and photometric control. What has to be fixed before A STEP departure for Dome C? • Need to drive A STEP on sky in France before computing the real pipeline – define specific alarm mode too – • Proposal: input from Heike – development as a team approach – raise fundings – archiving A STEP data – Proposal fro A STEP/BEST 2 comparisons/summer/winter network - internal DLR funding application by spring 2007

  8. Work packages and early schedule • WP-8 Target fields selection – survey strategy • -T Guillot • -FX Schmider • -F Pont • -H Rauer • -C Moutou • -M Deleuil • -S Aigrain • -F Fressin • Need for preliminary observations – or data base on target fields ? Specific needs for seismology targets ? • Target field selection from Holger thesis • Starting discussion with Marseille field selectors for CoRoT

  9. Work packages and early schedule • WP-9 Data analysis – Follow up of candidates • -T Guillot • -FX Schmider • -F Pont • -H Rauer • -A Erikson • -F Bouchy • -F Fressin • -S Aigrain • -C Moutou • What is necessary to fix soon ?

  10. Work packages and early schedule • WP-10 Future prospects – the best design for global transit search • -T Guillot • -H Rauer • -Y Fantei : internet site soon • -A Erikson • -F Pont • -FX Scmider • -F Fressin • comparative simulations with CoRoTlux – experience from BEST-2 – A STEP connection and CoRoT preliminary results • Necessity to propose different designs soon for visibility and outreach ? • Developping webpage / internal and public ? Yan Fantei

More Related