prentice
Uploaded by
8 SLIDES
203 VUES
80LIKES

Intelligent Pedestrian Lamp: Energy Efficiency for Enhanced Safety

DESCRIPTION

The Intelligent Pedestrian Lamp aims to address high electricity costs by providing a power-saving lighting solution for corridors, stairs, and gardens. This lamp not only enhances pedestrian safety but is also designed to be compatible with existing technology and robust enough to withstand wet and hot environments. Targeted at universities and city developers, this innovative product is set to be introduced in the 14th week of the semester. Our focus on energy efficiency and user safety positions us for success in both primary and secondary markets.

1 / 8

Télécharger la présentation

Intelligent Pedestrian Lamp: Energy Efficiency for Enhanced Safety

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. Intelligent Pedestrian Lamp CEKAP TEAM Engku Abdullah Muhsin 0538687 Mohd Hafiz b. Efrizal 0537381 MohdSyazwan b. Jamil 0530513 Muhammad Hazwan b. Zolkapli 0538673

  2. Need Identification • Recently, the cost of electricity is quite high. • One of the major energy consumption is lamps at corridors, stairs and gardens. • Lamp is important for pedestrian safety.

  3. Product Planning • Product Description • Intelligent lamp for power saving • Key business • Product introduced by week 14th semester 1 09/10 • Primary Market • IIUM Properties and other universities • Secondary Market • City developer, hotels, parking area

  4. Product Planning • Assumption • Compatible with current technology • Robust to wet and hot environment • Stakeholder • User • Retailer • Production • Legal department

  5. Work Breakdown Structure

  6. Linear Responsibility Chart

  7. Linear Responsibility Chart

  8. Gantt Chart