1 / 13

Japan’s response to the economic crisis Masafumi SHUKURI

6th APEC Transportation Ministerial Meeting (TPTMM6) 27-29 April 2009, Manila, Philippines. Japan’s response to the economic crisis Masafumi SHUKURI Vice Minister for Transport, Tourism and International Affairs Ministry of Land, Infrastructure, Transport and Tourism Government of Japan

qabil
Télécharger la présentation

Japan’s response to the economic crisis Masafumi SHUKURI

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 6th APEC Transportation Ministerial Meeting (TPTMM6) 27-29 April 2009, Manila, Philippines Japan’s response to the economic crisis Masafumi SHUKURI Vice Minister for Transport, Tourism and International Affairs Ministry of Land, Infrastructure, Transport and Tourism Government of Japan April 29, 2009

  2. Outline of the policy package to address economy crisis • ●Japanese economy facing crisis • ・“Global financial crisis”and • “Synchronous global recession ” -Shoot-term crisis: recovery -Structural crisis: divergence from export-led development strategy, toward low-carbon, healthlongevity, etc

  3. Outline of the policy package to address economy crisis ●Size and Effect ・Size of the package: national government JPY 15.4 trillion, total size JPY 56.8 trillion ・Real GDP increase in FY2009:2% ・Job creation: 0.4~0.5million/year 2

  4. Outline of the policy package to address economy crisis ●Outline of the policy package <Growth Strategy> ・Low-carbon revolution ・Health, longevity and child rearing ・Realizing the latent power of the Japanese economy and development ofinfrastructure for the 21st century <Easing anxiety and enhancing vitality> ・Revitalization of regions ・Ensure the security and safety 3

  5. Low-carbon revolution ①Support for environmentally–friendly vehicles Goal: 50% of new car sales to be eco-friendly cars by 2020 (JPYthousand) ・Purchase of New car Engine displacement ・Purchase of new cars with replacing old cars Engine displacement ・More eco-friendly cars for public cars Next generation vehicles (EV, fuel cell etc..) Hybrid bus

  6. Low-carbon revolution ②Transport Infrastructure ・Establishing superconducting MAGLEV train technology -Extending the test line -Accelerate technology development for implementation ・Evaluating by 2010 Gauge Change Train for practical use

  7. ・Establishment of practical technology for LRT powered by fuel cell ・Systems that supply onshore power to ships etc ship berth cable cable power electric facility 6

  8. Realizing the latent power of the Japanese economy and development of infrastructure for the 21st century ②Super-hub port initiative ・substantial reduction of cost and lead-time at ports by 2010 ①Connecting of “national missing road links” ・Construction of ring roads in the three metropolitan areas Congestion mitigation environment improvement Over 1,000m Over 16m Over 500m ・Expand industrial ports for enlarged vessels after expansion of Panama canal logistics support safety improvement width after before width depth 7

  9. ③Capacity and functional enhancement of the HANEDA airport, comprehensive study on hub-airport in metropolitan area ・Extension of C runway at HANEDA - Larger aircraft for long-haul international route during night hours ④Dramatic improvement of access from the world ・Connecting time -TOKYO ~ NARITA: 30 minutes TOKYO ~ HANEDA: 20minutes Extension of capacity of HANEDA airport B runway(2,500m) C runway(3,000m) A runway(3,000m) Navigation route C runway(360m) Bullet train and other nationwide transport network D runway(2,500m) Under construction 8

  10. ⑤Development of SHINKANSEN (bullet train) lines 9

  11. Easing Anxiety and enhancing vitality ①Revitalization of regions ・Railways, buses, ships ②Barrier free stations ・All the stations with more than 5,000 passengers will be, in principle, barrier free by 2010.(other local hub stations will become barrier free and will be equipped with platform doors. 10

  12. ③Safety measures ・Development of next generation safety driving assistance system utilizing IT Images of roadahead Traffic informationfor wide area Tourist information navigation Extended transmission capacity Frozen careful Frozen careful One onboard device provides various services Utilizing ITS

  13. Thank you! 12

More Related