This update provides definitions and settlement data for Advanced Metering Systems (AMS) and Electric Service Identifier (ESI ID) totals as of October 5, 2010. It details the installation status of different utilities, including Oncor, CNP, and AEP, with progress reported and future deployment plans outlined for the years 2010-2013. The document also highlights ERCOT's estimated data related to AMS meter types and includes a summary of the meetings scheduled by the Advanced Metering Implementation Team (AMIT) throughout October and December 2010.
E N D
MARS Taskforce RMS Update October 13, 2010
Definitions • AMC – • AMS (IDR) meter type settled using the 15-Minute LSE data received from TDSP • AMDG – • 15 Minute LSE data containing both generation and load values , also profile included DG with AMS (IDR) meter type • AMS data included Distributive Renewable Generation • Estimated – • ERCOT estimated data because profile showed AMS (IDR) meter type, however the 15-minute LSE data wasn’t available in ERCOT’s Settlement system at the time the ESI ID was being processed for Settlement .
InitialSettlement As of October 5, 2010 Operating Date: September 27, 2010 • AMC ESI ID Totals: 1,522,381AMDG ESI ID Totals: 229 • Estimated ESI ID Totals: 11,051
FinalSettlement As of October 5, 2010 Operating Date: August 9, 2010 • AMC ESI ID Totals: 1,282,123 • AMDG ESI ID Totals: 183 • Estimated ESI ID Totals: 1,764
True-Up Settlement As of October 5, 2010 Operating Date: April 8, 2010 • AMC ESI ID Totals: 721,360 • AMDG ESI ID Totals: 84 • Estimated ESI ID Totals: 2,100
AMS Meter Installation Status Report Oncor(approximately): • Installed: 1,343,458 as of 9.30.2010 • Deployment Plan: • 2010 – 929,000 meters • 2011 – 902,000 meters • 2012 – 902,000 meters
AMS Meter Installation Status Report CNP (approximately): • Installed: 661,238 as of 9.30.2010 • Deployment Plan, includes projected growth: • 2010 – 756,684 meters • 2011 – 960,327 meters • 2012 – 373,423 meters
AMS Meter Installation Status Report AEP (approximately): • Installed: 115,053 as of 9.29.2010 • Deployment Plan schedule: • 2010 – 188,212meters • 2011 – 251,571 meters • 2012 – 279,329 meters • 2013 – 278,280 meters
Market AMSInstalled Totals 2,119,749
PUCT Project 34610 Advanced Metering Implementation Team (AMIT) Documentation & Meeting Schedules can be found on: • Public Utility Commission of Texas Project 34610 Website: • http://www.puc.state.tx.us/electric/projects/34610/34610.cfm
September AMIT Deep Dive Meetings • Deep Dive into Roadmap and Strategic Re-alignment completed in September • ALLAMIT PROJECTS: • Project 1 - Interim Project • Project 2 – Smart Meter Texas Web Portal • Project 3 - ERCOT “Interim” Settlement Solution • Project 4 – Home Area Network (HAN) • Project 5 - Retail Market Interface • Project 6 – Education • Project 8 – “Long Term” Settlement Solution
Deep Dive Results • Deep Dive into Roadmap and Strategic Re-alignment completed in September • ALLAMIT PROJECTS:
Advanced Metering Implementation Team (AMIT) • October • 26-27th (F2F) • Tue: 9:30-5:30 • Wed: 9:30-5:30 • Location: Public Utility Commission, CHR, 7th Floor, {1701 N. Congress Ave, Austin, TX 78701} • Free Real-Time Video of Meetings available at: http://www.texasadmin.com/puct.shtml
Advanced Metering Implementation Team (AMIT) • November • 2nd (F2F) • Tue: 9:30-5:30 • Location: Public Utility Commission, CHR, 7th Floor, {1701 N. Congress Ave, Austin, TX 78701} • 16-17th (F2F) • Tue: 9:30-5:30 • Wed: 9:30-5:30 • Location: Public Utility Commission, CHR, 7th Floor, {1701 N. Congress Ave, Austin, TX 78701} • Free Real-Time Video of November Meetings available at: http://www.texasadmin.com/puct.shtml
Advanced Metering Implementation Team (AMIT) • December • 7th (F2F) • Tue: 9:30-5:30 • Location: Public Utility Commission, CHR, 7th Floor, {1701 N. Congress Ave, Austin, TX 78701} • Free Real-Time Video of December Meeting available at: http://www.texasadmin.com/puct.shtml