Two New Bridges, One Project. The Louisville - Southern Indiana Ohio River Bridges Project (LSIORBP). 01-30-2014 Real Estate Economic Forecast. Area Map. The Bridges Project. Purpose and Need. Safety problems Traffic congestion Inefficient mobility Inadequate system linkage

1 / 15

Télécharger la présentation

Two New Bridges, One Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. Two New Bridges, One Project The Louisville - Southern Indiana Ohio River Bridges Project (LSIORBP) 01-30-2014 Real Estate Economic Forecast

  2. Area Map Two New Bridges, One Project

  3. The Bridges Project

  4. Purpose and Need • Safety problems • Traffic congestion • Inefficient mobility • Inadequate system linkage • Planning consistency Bottom line: Improve cross-river mobility

  5. Downtown Crossing Two New Bridges, One Project

  6. Existing Kennedy Interchange

  7. Proposed Kennedy Interchange

  8. New I-65 Downtown Bridge • Six lanes of NB I-65 traffic • Located East of the Existing Kennedy Bridge • 99 Feet wide • 2,114 feet long with 3 towers • 71 feet above water

  9. Existing JFK Bridge Rehab • Deck Reconfiguration • Convert to SB Only • Deck Reconstruction • New SB Approach Spans Section 2 – Downtown Bridge

  10. Downtown Crossing - Indiana • Reconstructs I-65 to add additional lanes • Reconstructs approaches to the Clark Memorial Bridge to permit more direct access to I-65 Two New Bridges, One Project

  11. East End Crossing 4B • Kentucky Approach: reconstruction and new terrain road on KY 841 • Section 4A: from the southern limit of Section 4 to the northerly abutment of the proposed Harrods Creek/River Road bridge; this section includes the Drumanard Tunnel • Section 4B: from the north end of Section 4A to the new East End Ohio River Bridge 4 A 4 B 4A

  12. East End Crossing • East End Bridge: Anew four-lane Ohio River bridge with a pedestrian walkway and bikeway, opening to traffic in late 2016 (capable of being expanded to six lanes with only striping) 5 12

  13. East End Crossing • Indiana Approach: Construction of a new roadway from the existing SR 265/SR62/Port Road Interchange to the new East End Bridge New interchange at Salem Road 6 13

  14. Project Schedule Downtown Crossing December 28, 2012 – Contract Awarded To Walsh December 2016 – Construction Completion East End Crossing December 27, 2012 – Commercial Close to the Walsh – Vinci – Bilfinger (WVB) Team March 28, 2013 – Commercial Close October 2016 – Construction Completion Two New Bridges, One Project