1 / 11

The Team Challenge

The Team Challenge. O bjective. to work cooperatively as a team with the use of the team member cards. The Team Challenge. Your team challenge is to design and create a bridge from the resources available that will span a gap of at least 60cm.

rasha
Télécharger la présentation

The Team Challenge

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Team Challenge

  2. Objective • to work cooperatively as a team with the use of the team member cards

  3. The Team Challenge • Your team challenge is to design and create a bridge from the resources available that will span a gap of at least 60cm. • The winning bridge will be the one that can hold the largest weight. • Your group has a limited budget to purchase materials. Only the materials specialist can purchase materials. • The Materials Specialist may buy and sell between teams. • Should any teams draw the one spending the least will win. • Use your team worker cards appropriately • Use speaker cards during discussions • If you break the Health and Safety rules (6&7) the Health and Safety Executive will fine you. • If your team follows the Health and Safety rules well you might be awarded a bonus!

  4. Timeline • 20 minutes planning time before the warehouse opens • 1 hour construction time • 10 minutes testing time

  5. Resources • Fixing tape • Steel pipes • Pipe cutters • You have a budget of £86…… • Ready to start?

  6. The Warehouse • Steel Pipes – 30 - £10 • Cutter hire - £20 for 10 mins • Fixing tape - £40 per roll

  7. Stock Market Crash!

  8. The Warehouse • Steel Pipes – 20 - £4 • Cutter hire - £4 for 10 mins • Fixing Tape- £5 per roll

  9. The Warehouse Credit Crunch • Steel Pipes – 20 - £30 • Cutter hire - £45 for 10 mins • Fixing tape - £40 per roll

  10. Stock Market Boom!

  11. The Tax Man

More Related