Construction – Excavation Remove Land Stone Drainage Pump?
Construction – Foundation Legalett Slab Insulation Reinforcing Steel Concrete pour Keyway and seal design
Construction – Walls ICF Block Steel Openings Center column Concrete Keyway and seal design
Construction – Walls Column cap Track for membrane Pockets for beams
Construction – Finishing Protective coating Heating lines Cooling Field Influent and Effluent Pipe Installation Beam Installation Membrane Installation Powerhouse