LEAN system

LEAN system. Supporting goals. A balanced system, smooth, rapid flow of materials and/or work Supporting goals: Eliminate disruption Make the system flexible eliminate waste, especially exess inventory. Value. That customer is willing to pay

rene
Télécharger la présentation

LEAN system

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LEAN system

  2. Supporting goals • A balanced system, smooth, rapid flow of materials and/or work • Supporting goals: • Eliminate disruption • Make the system flexible • eliminate waste, especially exess inventory

  3. Value • That customer is willing to pay • That changes products color, function, shape, other attributes so that the product is getting closer to the customers requirements • That we do right at first time

  4. Wastes • Those processes which directly do not create value for customers (muda, mura, muri) : • that are not necessary, and must be eliminated • That are necessary, because these are supporting value-add processes, cannot be eliminated (like transporting) • Muda – 7 wastes of lean • Mura– not leveled workflow • Muri– overloading of workers and assets

  5. There are 7 wastes in LEAN (TIMWOOD): • Inventory • Overproduction • Waiting • Unnecessary transportation • Processing waste • Inefficient work methods • Defects

  6. Lean thinking Operation Traditional improvement Lean improvement Non value-add process Value-add process

  7. JIT Building Blocks • Process design • Product design • Personnel/organizationalelements • Manufacturing planning and control

  8. Process Design • Small lot sizes • Setup time reduction • Manufacturing cells • Limited work in process • Quality improvement • Production flexibility • Little inventory storage

  9. Reduces inventory Less rework Less storage space Problems are more apparent Increases product flexibility Easier to balance operations Benefits of Small Lot Sizes

  10. Setup time • reducing changeover time ( because small lots require frequent setups) • SMED (single minute exchange of die) • External • Internal activities.

  11. Manufacturing cells • In Functional Manufacturing similar machines are placed close together (e.g. lathes, millers, drills etc) • In Cellular Manufacturing systems machines are grouped together according to the families of parts produced. • The major advantage is that material flow is significantly improved, which reduces the distance travelled by materials, inventory and cumulative lead times.

  12. Quality improvement • Kaizen – continuous improvement of the system • Jidoka (Autonomation) – automatic detection of defects during production. It consist two activities: • One for detecting defects when they occur • Another for stopping production to correct the cause of defects. • Poka Yoke safeguards built into the process to reduce the possibility of errors.

  13. Work flexibility • Overall goal of lean is to achieve the ability to process mix of products in a smooth flow. • One potential obstacle is bottlenecks, which occur when portions of the system become overloaded. Because of • The absence of workers  cross trained workers • Not leveled workflow  use takt time • Example: • Total time per shift is 480 minutes per day • There are two shifts per day • There are two 20-minutes break and a 30 minutes lunch break per shift. • Daily demand is 80 pieces • Net time available per day= 2*(480-20*2-30)=820minutes • Takt time=820minutes/80 pieces=10,25 minutes • If the actual cycle time is higher, our customers won’t get their needs, if the actual cycle time is lower, there will be overproduction, and we have to inventory surplus products.

  14. Inventory storage • Inventory storage is a waste, • a buffer which can cover up problems, partly because inventory makes them seem less serious.

  15. Product Design • Standard parts – fewer parts to deal with lower training costs • Modular design – easy to satisfy different needs • Highly capable production systems – quality is designed into the product and the production process • Concurrentengineering

  16. Personnel/Organizational Elements • Workers as assets • Cross-trained workers • Continuous improvement • Cost accounting • Leadership/project management

  17. Manufacturing Planning and Control • Level loading • Pull systems • Visual systems • Close vendor relationships • Reduced transaction processing • Preventive maintenance

  18. Mixed model sequencing • the sequence (on the base of setup time and setup cost – let it be now A,C,B) • how many times the sequence should be repeated (determine the smallest integer) • how many units to produce

  19. Pull/Push Systems • Pull system: System for moving work where a workstation pulls output from the preceding station as needed. (e.g. Kanban) • Push system: System for moving work where output is pushed to the next station as it is completed

  20. Visual system • Kanban- a manual system responds to signals of the need for delivery of parts and materials (both to the factory and between the workstation) • Production kanban • Conveyance kanban

  21. Buyer Supplier Supplier Supplier Supplier Supplier Supplier Supplier Traditional Supplier Network Figure 12.4a

  22. Tiered Supplier Network Buyer Supplier Supplier Supplier Supplier Supplier Supplier Supplier Figure 12.4b First Tier Supplier Second Tier Supplier Third Tier Supplier

  23. Comparison of JIT and Traditional Table 12.3

  24. Preventive maintenance • Total Productive Maintenance – operators responsible for the equipments they use • Housekeeping – 5S • Sort • Straighten • Sweep • Standardize • Self-discipline

  25. Thank you for your attention!