Analysis of HDL/LDL Overrides in November

This report captures unique HDL/LDL overrides for November, with a comparison to previous months. Reasons for overrides include outages, contingencies, operator actions, and voltage support during planned outages.

Télécharger la présentation

Analysis of HDL/LDL Overrides in November

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Manual HDL/LDL Override Summary QMWG

  2. Daily Summary Graph • For this analysis, we captured unique HDL/LDL overrides • An override is considered unique if that same Resource did not have an override within the last 10 minutes • There were 43 total unique overrides in November • As compared to 17 in October and 13 in September

  3. Daily Summary Table

  4. Reasons for Manual HDL/LDL Overrides • A significant number of overrides required as a result of outages creating transient stability issues • Also needed overrides for contingencies becoming unsolved in RTCA due to low voltages • A small number due to Operators pre-posturing the system in preparation for outages • Remainder due to voltage support needs resulting from planned outages