rosalyn-lynch
Uploaded by
24 SLIDES
545 VUES
240LIKES

Chapter 8

DESCRIPTION

Chapter 8. Population Ecology. Types of Species in Communities. N ative species species that normally live in a particular community Nonnative species also referred to as “invasive” or “alien” species species that enter a new community either through immigration or introduction

1 / 24

Télécharger la présentation

Chapter 8

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chapter 8 Population Ecology

  2. Types of Species in Communities • Native species • species that normally live in a particular community • Nonnative species • also referred to as “invasive” or “alien” species • species that enter a new community either through immigration or introduction • Introduction may be deliberate or accidental • i.e. “killer bees,” Kudzu, zebra mussels, Asian oysters, domesticated animals

  3. Indicator Species • species whose decline or migration indicates a significant change (damage) to a particular community • Serve as “early warning sentinels” of environmental degradation • Examples: • Amphibians • Trout • Birds • Aquatic macroinvertebrates

  4. Keystone Species • species whose removal from its community may dramatically alter the structure and function of the community • roles: • pollinators • top predators • decomposers

  5. Foundation Species • species that alters its habitat in ways that benefit other species • behaviors of such species may influence succession and increase species richness • sometimes identical to the keystone species, while other times serves as a counterbalance • Examples: elephants, kelp, eastern hemlock, mussels

  6. Population Distribution • Three general patterns: (see below) • Most populations live in clumps although other patterns occur based on resource distribution. Figure 8-2

  7. Why Clumping? • Resource availability varies from place to place. • Living in herds, flocks, or schools provides protection from predators and population declines. • Fish, birds, caribou, antelope, zebra • Predators that live in groups are afforded a better chance of catching prey and getting a meal. • Wolves, hunting dogs • Temporary animal groupings may occur for mating and caring for young. • Dolphin, albatross

  8. Changes in Population Size • Populations increase through births and immigration • Populations decrease through deaths and emigration

  9. Population Age Structure: • How fast a population grows or declines depends on its age structure. • Prereproductive age: not mature enough to reproduce. • Reproductive age: those capable of reproduction. • Postreproductive age: those too old to reproduce. • Populations with mostly reproductive individuals tend to increase. • Populations with mostly post-reproductive individuals tend to decrease. • Stable populations are equitability distributed among all three categories.

  10. Limits on Population Growth: Biotic Potential vs. Environmental Resistance • No population can increase its size indefinitely. There are always limits to population growth in nature. • Population change is a balance between: • Biotic potential - the intrinsic rate of increase (r) or the rate at which a population would grow if it had unlimited resources and… • Environmental resistance – all the factors that act to limit the growth of a population. • Together these determine a populations carrying capacity (K): the maximum population of a given species that a particular habitat can sustain indefinitely without degrading the habitat.

  11. Exponential and Logistic Population Growth: J-Curves and S-Curves • Exponential or geometric growth – starts slowly but accelerates rapidly as population increases • J-shaped curve plotted on a graph of population vs. time • Logistic growth – exponential growth followed by a steady population decrease until the population size levels off • S-shaped curve • Usually levels off at or near the carrying capacity • Carrying capacity is not fixed

  12. Environmental Resistance Carrying capacity (K) Population size (N) Biotic Potential Exponential Growth Time (t) Fig. 8-3, p. 163

  13. Population Growth Curves • Exhibit four phases • Lag – phase characterized by low birth rates, when the population is adjusting to a new environment • Growth – phase which shows a dramatic increase in population size (B+I > D+E) • Stationary – phase when then population is in dynamic equilibrium (B+I = D+E) • Death – phase in which the population declines (B+I < D+E)

  14. Can a Population Exceed Its Carrying Capacity? • Members of populations which exceed their resources will die unless they adapt or move to an area with more resources. • Some populations overshoottheir carrying capacity. • Reproductive time lag • Causes a dieback or a crash • Some populations may increase their carrying capacity by developing adaptive traits (i.e. natural selection) • Some species maintain their carrying capacity by migrating to other areas.

  15. Overshoot Carrying capacity Number of sheep (millions) Year Fig. 8-4, p. 164

  16. Population overshoots carrying capacity Population Crashes Number of reindeer Carrying capacity Year Fig. 8-6, p. 165

  17. Population Density and Population Change: Effects of Crowding • Population density: the number of individuals in a population found in a particular area or volume. • A population’s density can affect how rapidly it can grow or decline. • Density dependent factors include biotic factors like disease, competition for resources, predation, and parasitism • Some population control factors are not affected by population density. • Density independent factors include abiotic factors like weather, fire, pollution, and habitat destruction

  18. Types of Population Change Curves in Nature • Population sizes may stay the same, increase, decrease, vary in regular cycles, or change erratically. • Stable: fluctuates slightly above and below carrying capacity. • Irruptive: populations explode and then crash to a more stable level. • short-lived, rapidly reproducing species (i.e. algae, insects) • Cyclic: populations fluctuate according to regular cyclic or boom- and-bust cycles. • close predator-prey interactions • Irregular: erratic changes possibly due to chaos or drastic change. • populations that inhabit unstable or highly variable environments

  19. Hare Lynx Population size (thousands) Year Fig. 8-7, p. 166

  20. REPRODUCTIVE PATTERNS • Some species reproduce without having sex (asexual). • Offspring are exact genetic copies (clones). • Others reproduce by having sex (sexual). • Genetic material is mixture of two individuals. • Disadvantages: males do not give birth, increase chance of genetic errors and defects, courtship and mating rituals can be costly (energetically). • Major advantages: promotes genetic diversity, division of labor among the sexes may provide offspring greater protection through critical periods.

  21. Reproductive Patterns:Opportunists and Competitors • r-selected species: Large number of smaller offspring with little parental care • K-selected species: Fewer, larger offspring with higher invested parental care Figure 8-9

  22. Reproductive Patterns • r-selected species tend to be opportunists while K-selected species tend to be competitors. Figure 8-10

  23. Survivorship Curves: Short to Long Lives • The way to represent the age structure of a population is with a survivorship curve. • Late loss population live to an old age. • Constant loss population die at all ages. • Most members of early loss populations, die at young ages. Number of individuals age

  24. WORK CITED Population Ecology. (1998) Cyber Ed.

More Related