1 / 34

Factory briefing

Factory briefing. Content 1. General 2. Employee information 3. Quality award 4. Production process 5. Factory facilities 6. Environmental 7. Training post . Factory briefing. Content 1. General 2. Employee information 3. Quality award 4. Production process

rossa
Télécharger la présentation

Factory briefing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Factory briefing Content 1. General 2. Employee information 3. Quality award 4. Production process 5. Factory facilities 6. Environmental 7. Training post

  2. Factory briefing Content 1. General 2. Employee information 3. Quality award 4. Production process 5. Factory facilities 6. Environmental 7. Training post

  3. Factory briefing Royal Philips Electronicshave totally around 230,000employees in more than 60 countries and active in the areas of : Lighting, Consumer electronics, Domestic appliances, Components, Semi-conductors, Medical system and IT services.

  4. Factory briefing Under Consumer Electronics Mainstream division, two factories have been set up in Sha Jing - Shen Zhen. They are, SBI - San Yi Start operation in Jan. 1995 SBI - Good View Start operation in Aug. 1997

  5. Factory briefing SBI Factories

  6. Factory briefing San YiGood View Site area55.0 78.0 Factory floor space 33.0 55.0 Dormitory 31.3 31.2 Utility 6.7 7.4 Total floor space 71.0 93.6 Unit : in Kilo Square Meter

  7. Factory briefing

  8. Factory briefing Business nature Product type Portable audio Audio system DVD Speaker driver / box CD - R player Beside Philips brand, we also produce the product for Yamaha and Marantz

  9. Factory briefing

  10. Factory briefing Content 1. General 2. Employee information 3. Quality award 4. Production process 5. Factory facilities 6. Environmental 7. Training post

  11. Factory briefing Total headcount in Hong Kong Audio headquarter : 580 Total headcount in two PRC factories : 7,500

  12. Factory briefing “ Value peopleas our greatest resource “ is one of Philips company objectives. We understand PEOPLE is an important asset towards success. To execute the objective, we will continuously improve our working environment and provide the appropriate training to the employee.

  13. Factory briefing Training target 11 training days per PRC employee per year Actual1998 14 Days 1999 16 Days 2000 18 Days

  14. Factory briefing Content 1. General 2. Employee information 3. Quality award 4. Production process 5. Factory facilities 6. Environmental 7. Training post

  15. Factory briefing Quality achievement HK headquarterSan YiGood View ISO 9001 Oct., 1991 May, 1996 Oct., 1998 ISO 14001 Dec., 1997 Dec., 1997 Dec., 1998

  16. Factory briefing • Some of latest awards • Consumer Electronics Show 2001 • Innovations 2001 Design and Engineering honors - audio • AJ3950 Stereo CD-clock radio • AZ3000 CD sound machine • MC-90 CD recordable micro Hi Fi system • CDR820 CD recorder with 3CD changer

  17. Factory briefing • Some of latest awards ( cont’d ) • Industries Forum Design Hannover • IF Product design award 2001 in Consumer Electronic category • RUSH MP3 player

  18. Factory briefing Content 1. General 2. Employee information 3. Quality award 4. Production process 5. Factory facilities 6. Environmental 7. Training post

  19. Factory briefing Production process Automatic Component Placement Manual insertion Soldering Testing & Alignment Final Assembly Packing

  20. Factory briefing Installed facilities No. of Daily component ACP machines placement Sequencer 17 sets 8.1 millions VCD 27 sets 9.1 millions Radial Lead 24 sets 2.6 millions SMD 31 lines 9.6 millions

  21. Factory briefing PCBA area

  22. Factory briefing Installed facilities Automatic soldering machines 17 lines Assembly line Variable Transportation System 18 lines Conveyor Belt 32 lines

  23. Factory briefing Final assembly area

  24. Factory briefing Content 1. General 2. Employee information 3. Quality award 4. Production process 5. Factory facilities 6. Environmental 7. Training post

  25. Factory briefing Some of Recreation facilities Tennis court Basketball court

  26. Factory briefing Karaoka room Karaoka hall

  27. Factory briefing Facilities Local staff canteen Dormitory / recreation complex Worker 14 Blocks PRC senior staff 2 Blocks HK / oversea staff 2 Blocks Recreation complex 2 Blocks

  28. Factory briefing HK and oversea Staff dormitory

  29. Factory briefing Content 1. General 2. Employee information 3. Quality award 4. Production process 5. Factory facilities 6. Environmental 7. Training post

  30. Factory briefing Some of our environmental concern Our Green area : 11 % of site area No. of tree : 1,200 ( 45 type ) No of Flower : 5,000 ( 25 type )

  31. Factory briefing Waste water purification system Max. Capacity = 100 tons / day

  32. Factory briefing Content 1. General 2. Employee information 3. Quality award 4. Production process 5. Factory facilities 6. Environmental 7. Training post

  33. Factory briefing Training post offered Testing engineerx 1 Machine processing engineer x 1 Electronics engineerx 2 IT trainee x 2

  34. Factory briefing For more Philips information, pls. visit our WEB site www.philips.com

More Related