1 / 6

Component 1: Environmental Planning Systems, Methods and Safeguards Improved Activity Progress and Component Strategy

Component 1: Environmental Planning Systems, Methods and Safeguards Improved Activity Progress and Component Strategy . Activity Progress May-Oct 2012. Contingent valuation of ecosystem services in Champassak province, Lao PDR Study completed by Champassak University, report underway

ruby
Télécharger la présentation

Component 1: Environmental Planning Systems, Methods and Safeguards Improved Activity Progress and Component Strategy

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Component 1: Environmental Planning Systems, Methods and Safeguards Improved Activity Progress and Component Strategy

  2. Activity Progress May-Oct 2012 • Contingent valuation of ecosystem services in Champassak province, Lao PDR • Study completed by Champassak University, report underway • SEA application and decision support for area based plans • Training on applying SEA in river basin context (RR SEA) • Completion of Golden Quadrangle Tourism SEA and presentation of findings and recommendations at Tourism Working Group. • Development of interactive knowledge portal • Completion of 28 core indicators and launch of the GMS Indicator Portal • Identification of new indicators inetgrating into GMS Program

  3. Component 1

  4. Results-based management: Planning • 2013 • 2014 • 2015 • Understanding of natural capital and ecosystem services in the GMS improved • Research partnerships established; methodology in place • Awareness of value and financial costs related to ecosystem services increased • VES maps and values published and disseminated • VES methods integrated in strategic planning • VES statistics / maps used in area-based and/or sector plans • Environmental valuation methods integrated into into area based planning • Planning support tools being applied to 3 or more area-based plans • Capacity of planners to support greening of sector strategies and plans improved • At least 3 GMS universities trained in SEA and related tools • Environmental considerations integrated into GMS area-based plans • SEA guidelines in place / underway in 3 GMS countries • Documented changes in area-based plans based on SEA support • Initial SEA awareness raised in energy sector in Cambodia and Lao PDR • At least 30 stakeholders trained in SEA application for energy/ power development • Environmental planning tools introduced & capacity built for energy sector • At least 1 institution/ university in each county is capable of applying SEA in energy/ power development plans • Environment/ Ecosystems services values (cost/benefits) incorporated in national power/energy development plans • Documented changes in energy/power development plan in 2 additional countries

  5. Results-based management: Safeguards and monitoring • 2012 • 2013 • 2014 • 2015 • Priorities for country-specific safeguards capacity building and monitoring identified • Safeguards diagnostic report and action plan prepared • Improved safeguards application in ADB project (incl. transport & BCC) • RSAT tested in at least 2 river basins; documented improvement in EIA application for transport in 3 countries • Harmonization of GMS country safeguards with international best practice • At least 6 safeguards training per year • Documented improvement in safeguards application • Transition from static program website to interactive knowledge portal completed • Indicator portal receives at least 100 hits per month within 6 months from launch and at least 2500 hits within the first 18 months • Environmental Information System developed and integrated at country-level • At least 80 DPSIR indicators available and updated with support from NSU • Site level monitoring and evaluation framework adopted by BCC • BCC site progress monitored and published annually • EIS supports relevant national & site-level monitoring • At least 2 new knowledge management / sharing tools deployed • At least 2 environmental reporting systems making use of EIS data • CEP-BCI online knowledge portal recognized as a key resource center • At least 10 external publications (reports, journal papers, conference presentations) make use of EIS data • Effectiveness of BCC investments monitored • 10 key indicators on BCC sites and landscapes maintained annually

  6. Planned Activities (rest of 2012) Strategic planning • Scope out activity on economics of natural capital (Regional) • Technical inputs into ADB‟s Red River basin water resources planning (VIE) • Preparation of publication on subregional tourism SEA Safeguards • Assessment of GMS country safeguards sufficiency and potential to harmonize with ADB safeguard approaches • Myanmar EIA, monitoring and compliance capacity development Monitoring • Upgrade EOC GMS Indicator Portal with new indicators • Scoping of regional forest mapping and EOC knowledge portal upgrades • Publication of national EPA reports and subregional EPA synthesis report

More Related