1 / 23

Internet2 Network of the Future

Internet2 Network of the Future. Steve Corbat ó Director, Backbone Network Infrastructure CANARIE Advanced Networking Workshop Toronto 27 November 2001. Internet2 Network of the Future. Current state of Abilene Evolution of optical networking Next phase of Abilene.

rwinkler
Télécharger la présentation

Internet2 Network of the Future

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Internet2 Network of the Future Steve Corbató Director, Backbone Network Infrastructure CANARIE Advanced Networking Workshop Toronto 27 November 2001

  2. Internet2 Network of the Future • Current state of Abilene • Evolution of optical networking • Next phase of Abilene

  3. Abilene background & milestones • Abilene is a UCAID project in partnership with • Qwest Communications (SONET service) • Nortel Networks (SONET kit) • Cisco Systems (routers) • Indiana University (network operations) • ITECs in North Carolina and Ohio (test and evaluation) • Timeline • Apr 1998: Project announced at White House • Jan 1999: Production status for network • Oct 1999: IP version of HDTV (215 Mbps) over Abilene • Apr 2001: First state education network added • Jun 2001: Participation reaches all 50 states & D.C. • Nov 2001: Raw HDTV/IP (1.5 Gbps) over Abilene

  4. Abilene focus • Enabling innovative applications and services not possible over the commercial Internet • Advanced service efforts • Multicast • IPv6 • QoS • Measurement • Security • DDoS detection efforts (Arbor Networks & Asta Networks)

  5. Abilene status – November, 2001 • IP-over-SONET (OC-48c) backbone • 54 direct connections • 3 OC-48c (2.5 Gbps) connections • 22 will connect via at least OC-12c (622 Mbps) by year end • 200+ primary participants • All 50 states, District of Columbia, & now Puerto Rico • 15 regional GigaPoPs support ~70% of participants • 37 sponsored participants • 15 state education networks (SEGPs) • Collaboration of sponsoring member universities and Abilene connectors

  6. International connectivity • Transoceanic R&E bandwidths growing! • Key international exchange points facilitated by Internet2 membership and the U.S. scientific community • STARTAP & STAR LIGHT – Chicago • Pacific Wave – Seattle • Abilene now has GigE connectivity to both SL and P/WAVE • AMPATH – Miami • New York City – GigE/10GigE EP under development • CA*NET3: Seattle, Chicago, and New York • CUDI: CENIC and Univ. of Texas at El Paso • International transit service • Collaboration with CA*NET3 and STARTAP

  7. Measurement and DDoS • Traffic characterization (Ohio ITEC) • Network utilization by state education networks and AITN • Abilene Scavenger Service policing • GigaPoP pair hotspot identification • Passive measurement • Planned for Indianapolis router backbone links • Collaboration with SDSC/MOAT group • Distributed Denial of Service detection • Strong IU Global NOC interest • Asta Networks (UCSD/U of Washington roots) • Arbor Networks (U of Michigan/Merit roots) • Data privacy and anonymity policy

  8. Abilene & SCxy • Emblematic of ongoing support for HPC • Annually escalating bandwidth • SC99 Portland: OC-12c SONET (622 Mbps) • SC2000 Dallas: OC-48c SONET (2.5 Gbps) • SC2001 Denver: 2xOC-48c SONET (5 Gbps) • SC2002 Baltimore: 10-Gbps  (planned) • SCxy transit connectivity offered to domestic & international R&E nets • Backbone MTU raised to 9K bytes • Traffic engineering for SC2001 • End-to-End Performance: GigaTCP testing

  9. Abilene traffic engineering – SC2002

  10. Network of the Future:Context for the next backbone • Computational science as an emerging interdisciplinary field • Bandwidth and distributed sensing capability as the next critical parameters • Complement CPU, memory & storage • Increasingly distributed data collection and storage • NSF Distributed Terascale Facility solicitation • Emergence of optical technologies • Dense Wave Division Multiplexing (DWDM) • Important distinction: optical transport vs. switching • Much new transcontinental conduit and fiber in place; a lot of business plans abandoned… • Glut of fiber & conduit – but not bandwidth

  11. Current state of optical networking • Dense Wave Division Multiplexing (DWDM) • Current systems can support >160 10-Gbps ’s (1.6 Tbps!) • Optical growth can overwhelm Moore’s Law (routers) • Costs scale dramatically with distance • Three possible scenarios for the future • Enhanced IP transport (higher BW and circuit multiplicity) • Fine-grained traffic engineering • p2p links between campuses, HPC centers, & Gigapops • Physical manifestation of switched circuits (a la ATM SVCs) • Evolution of optical switching will be critical • Leading international efforts in R&E exploration • The Netherlands, Canada, STAR LIGHT (Chicago)

  12. National optical networking options • 1 - Incremental wavelengths • Provision 10-Gbps ’s from provider(s) in the same way that SONET circuits are done for Abilene now • Exploit smaller incremental cost of additional ’s • 2 - Dim Fiber • Partnership with a facilities-based provider • Acquisition of fiber IRU and subsequent O&M agreement for inter-PoP services (amplifiers, regenerators, DWD MUXes?) • BSA’s metro condominium fiber concept on the national scale • National footprint of 1-2 fiber pairs • IRU for the fiber alone could cost $10-20M • Most likely awaits the availability of lower-cost optical transmission equipment

  13. Future of Abilene • Original UCAID/Qwest MoU amended on October 1, 2001 • Extension of Qwest’s original commitment to Abilene for another 5 years – 10/01/2006 • Originally expired March, 2003 • Upgrade of Abilene backbone to optical transport capability - ’s • x4 increase in the core backbone bandwidth • OC-48c SONET (2.5 Gbps) to 10-Gbps DWDM • Capability for flexible provisioning of ’s to support future point-to-point experimentation & other projects

  14. Key aspects of next backbone - I • Native IPv6 • Motivations • Resolving IPv4 address exhaustion issues • Preservation of the original End-to-End Architecture model • p2p collaboration tools, reverse trend to CO-centrism • International collaboration • Router and host OS capabilities • Run natively - concurrent with IPv4 • Replicate multicast deployment strategy • Close collaboration with Internet2 IPv6 Working Group on regional and campus v6 rollout • Addressing architecture

  15. Key aspects of the backbone - II • Network resiliency • Abilene ’s will not be protected a la SONET • Increasing use of videoconferencing/VoIP impose tighter restoration requirements (<100 ms) • Options: • Currently: MPLS/TE fast reroute • Would prefer IP-based IGP fast convergence • Addition of new measurement capabilities • Enhance active probing • Latency & jitter, loss, TCP throughput • Add passive measurement taps • Support of Internet2 End-to-End Performance Initiative • Intermediate performance beacons

  16. Next generation network deployment • October, 2001: Detailed technical design starts • Spring 2002: PoP upgrades start • deployment in three phases • April, 2002 – Phase 1 • October, 2002 – Phase 2 • April, 2003 – Phase 3 • October 2003 - Completion of 10-Gbps upgrade

  17. Network design overview • Overall next generation topology is expected to be very similar to current design • Previous iterations to router locations • Washington DC, Chicago, Sunnyvale, Houston • A few differences expected due to Qwest DWDM topology • Expect same number of backbone routers (12)

  18. Regional optical fanout • Next generation architecture: Regional & state based optical networking projects are critical • three-level hierarchy: Backbone, GigaPoPs/ARNs, campuses • Leading examples • CENIC ONI (California), I-WIRE (Illinois), • SURA Crossroads (Southeastern U.S), Indiana, Ohio • Collaboration with the Quilt • Regional Optical Networking project • U.S. carrier DWDM access is now not nearly as widespread as with SONET circa 1998

  19. The Quilt • A UCAID project support regional advanced networking initiatives • 15 charter GigaPoPs (2 more have joined since) • Connections typically support 4 or more research universities • EDUCAUSE and SURA • Quilt GigaPoPs support over 70% of Abilene participants • Initial projects • Commodity Internet Services • Regional Optical Networking (ties into Internet2 NoF) • Measurement (ties into Internet2 E2E Performance) • Led by Wendy Huntoon (Pittsburgh SC/CMU)

  20. Conclusions • Abilene future • UCAID’s partnership with Qwest extended through 2006 • Backbone to be upgraded to 10-Gbps in three phases starting spring 2002 • Capability for flexible  provisioning in support of future experimentation in optical networking • Overall approach to the new technical design and business plan is for an incremental, non-disruptive transition • Follow-on network most likely will be developed around a national dark fiber facility and will utilize next generation optical transport technology

  21. For more information • Web: www.internet2.edu/abilene • E-mail: abilene@internet2.edu

  22. www.internet2.edu

More Related