1 / 27

Transportation Asset Management Council (TAMC) Reporting Using RoadSoft

Transportation Asset Management Council (TAMC) Reporting Using RoadSoft. Mary Crane & Scott Pollins Audio : 1-866-228-9900 Access Code: 824407. Directing Traffic. *6 to mute/un-mute phone line Mute phone unless you have the floor Use chat to get the floor before speaking

sagira
Télécharger la présentation

Transportation Asset Management Council (TAMC) Reporting Using RoadSoft

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Transportation Asset Management Council (TAMC) ReportingUsing RoadSoft Mary Crane & Scott Pollins Audio: 1-866-228-9900 Access Code: 824407

  2. Directing Traffic • *6 to mute/un-mute phone line • Mute phone unless you have the floor • Use chat to get the floor before speaking • Moderator will call on you to give you the floor

  3. Today’s Agenda • PowerPoint • Live Demonstration of Bridge Module and Bridge Exports • Questions on Bridge Exports • Live Demonstration of Road Exports • Questions on Road Exports • Very Basic Into to RoadSoft Road Module (time permitting)

  4. Topics for Today • Why do we need to submit these exports? • How do we submit these exports? • Additional requirements for 2007 • Using RoadSoft to store project data • Submitting TAMC exports using RoadSoft

  5. Why do we need to submit these RoadSoft Exports? • It is an Act51 requirement

  6. How your organization can submit TAMC information • Michigan Center for Geographic Information (MCGI) – Investment Reporting Tool • http://tamc.mcgi.state.mi.us/TAMC/ • RoadSoft • Using theTAMC menu • then email to CGI or upload to IRT

  7. IRT or RoadSoft? • Web Based (IRT) • Do not want to define surface types (IRT) • Reports (IRT and RoadSoft) • Strategy Evaluation and Optimization • Data integrated with other assets • Cannot import IRT data into RoadSoft

  8. Additions for 2007RoadSoft TAMC Exports • Ability to Upload Exports to CGI • Current (2007) and Planned Bridge treatments by location (2008, 2009 ,2010) • Planned Bridge treatments by type (2008, 2009, 2010)

  9. 1. Current and Planned Treatments by Location (Bridge) • Treatments that have been completed during the calendar year 2007 • Treatments Planned for 2008, 2009, 2010 • This information is located in Bridge Module using the Local Maintenance Tab

  10. 2. Planned Treatments by Type (Bridge) • Included with road exports by type

  11. RoadSoft TAMC Road Exports • Current Road Treatments by Location (2007) • Planned Road Treatments by Location (2008, 2009, 2010) • Planned Road Treatments by Type (2008, 2009, 2010)

  12. 1. Current Treatments by Location (Road) • Treatments that have been completed during the calendar year 2007 • This information is located in the Road Module under the Rating Segment using the Rating/Construction History Tab

  13. 2. Planned Treatments by Location (Road) • Treatments Planned for 2008, 2009, 2010 • This information is located in Road Module under the Rating Segment using the Scheduled Maintenance Tab

  14. 3. Planned Treatments by Type – (Road) • Treatments Planned for 2008, 2009, 2010 • Treatments that are currently not in RoadSoft

  15. Which Road Exports do I send? • Current Road Treatments by Location (2007) Everybody • Planned Treatments By Location (2008, 2009, 2010) If some or all of your planned treatments are in RoadSoft • Planned Treatments by Type (2008, 2009, 2010) If some or none of your planned treatments are in RoadSoft

  16. Which Bridge Exports do I send? • Current and Planned Bridge Treatments by Location (2007) Everybody who has done bridge treatments in 2007 Planned Treatments for 2008, 2009, 2010 • Planned Bridge Treatments by Type (2008, 2009, 2010) Included with Road Planned Export

  17. Required Mappings before submitting RoadSoft reports • Mapping of RoadSoft Surface Type Treatments to TAMC Class and TAMC Treatments • Standard treatments have been mapped for you • Custom treatments must be mapped using the Surface Type Definition form

  18. Picture of

  19. Asset Management Coordinator • Gil Chesbro • chesbrog@michigan.gov • (517) 335-2963

  20. RoadSoft Technical Support • Email:Roadsoft@mtu.edu • Phone: (906) 487-2102

More Related