1 / 12

PASCOR Group

PASCOR Group. Industry Adviser : Craig Smit Product Engineer Faculty Adviser : Chien Wern, Ph.D. Presenter : Joe Hartley Team Members : Jeremie Bilisari Steve Greene Robby Hoff Matt Smith. Overview. Background Mission Statement Project Plan Project Scope

salena
Télécharger la présentation

PASCOR Group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PASCOR Group Industry Adviser: Craig Smit Product Engineer Faculty Adviser: Chien Wern, Ph.D. Presenter: Joe Hartley Team Members: Jeremie Bilisari Steve Greene Robby Hoff Matt Smith

  2. Overview • Background • Mission Statement • Project Plan • Project Scope • Project Design Specifications • House of Quality • Conclusion

  3. Background • PASCOR – Pacific Air Switch Corporation

  4. Background • Brazing Process

  5. Background • Current Strip Forming System

  6. Mission Statement • Develop a fully automated silver strip cutting and forming device. The device is required to produce formed strips quickly and accurately while also being robust and portable.

  7. Project Plan • Internal/External Search Presentation - February 20th • Conceptual and System Design - March 30th • Prototype Construction and Testing - April 15th June 7th

  8. 2”, 3”, 5” & 6.5” 1/4” Tolerance ( +/- 1/16” ) R=1/4” Project Scope • Customers -Internal -External • Design Constraints - Formation - Tolerance - Rate of Production

  9. Project Design Specifications • High Priority Criteria -Safety: Emergency Switch & Safety Guards - Performance: Adjustability, Tolerance & Parts/sec. • Medium Priority Criteria -Durable - Use of Replaceable Parts -Cost of Production < $5,000 • Low Priority Criteria -Curvature of Strips

  10. House of Quality

  11. Conclusion • Design a high quality strip/forming device. • Deliver a working prototype by June ’06. • Keep cost below set budget.

  12. Questions?

More Related