This presentation provides an update on the progress of the High-Speed UAV team, including the current schedule and status of critical function prototypes (CFPs). Key highlights include the completion timeline for the carbon fiber shell and airframe, developments in funding with potential donor commitments, and analysis results from wind tunnel tests. Insights into lessons learned from utilizing carbon fiber techniques and CNC methods are also shared. The team aims to advance UAV construction methodologies while addressing critical prototype needs.
E N D
High Speed UAV Team 4th Update Presentation
Introduction • Schedule and Status – Brad • Critical Function Prototypes (CFPs) – Brian • Conclusion - Steve
Schedule/Status • Carbon Fiber Shell • Lay up re-attempted: Behind Schedule • Complete Shell: Mid December • ½ Scale CNC Model • Wing Section Successful • Complete Airframe: Mid December
Schedule/Status • Funding • Potential Donor • Commitment by End of the Year • Fluent Analysis Complete • Parameters • Results Analyzed
Wing: Top View Flow
CFPs • Carbon Fiber Body • ½ Scale Wind Tunnel Model • RC Airplane
Carbon Fiber Body • Purpose • Learn Carbon Fiber Techniques • Test Strength • Cost and Time of Manufacturing • Lessons Learned • Molds • Lay Up Techniques
½ Scale Wind Tunnel Model • Purpose • Verify Results of Fluent Analysis • Wind Tunnel Testing • Lessons Learned • CNC Techniques • ½ Scale vs. ¼ Scale
RC Airplane • Purpose • Learn and Test Controller • Utilize RC Components • Lessons Learned • Small Aircraft Construction • Airplane Ready to Go • Awaiting Purchase of Controller
Conclusion • Schedule/Status • CFPs • Funding • Fluent • CFPs • Purpose • Lessons Learned