1 / 13

ECS

ECS. Xavier Vilasís Cardona. Outline. DCS Structure Status Alarms News on HV and LEDs See Anatoli’s presentation Detector monitoring See Jean Luc presentation (+ TVB) Global Control Project Integration Others Plans. To face detector operation. We need to reliably

Télécharger la présentation

ECS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ECS Xavier Vilasís Cardona Calo Commissioning Meeting - Xvc

  2. Outline • DCS • Structure • Status • Alarms • News on HV and LEDs • See Anatoli’s presentation • Detector monitoring • See Jean Luc presentation (+ TVB) • Global Control Project Integration • Others • Plans Calo Commissioning Meeting - Xvc

  3. To face detector operation • We need to reliably • Know the detector state • Act upon it • Implied elements are • DCS • VFE Temperatures • Power Supplies • Racks • Turbines • Crates • HV Calo Commissioning Meeting - Xvc

  4. DCS – now become urgent • Temperature controls • PS in principle is now functional • SPD temperature probes calibrated • See Edu’s presentation • Need to be programmed • Power supplies • SPD regulator board switch on operation in DCS • Coherence of current states and actions • Study DAI precedence • How many RECIPES do we have for LV and MV Power Supplies ? • Integrate into new DCS tree • Changes in the proposed version regarding side splitting Calo Monday Meeting - Xvc

  5. DCS – following steps • Establish two levels of detector alarm • Started for LVPS for safety reasons • Observe values to establish normal detector behaviour • Determine two levels • Alarm sent to alarm panel • Set DU in error • Discuss and establish automated actions upon alarms • Started for LVPS for safety reasons Calo Monday Meeting - Xvc

  6. DCS Tree - XCAL • Keep side splitting at a higher level.

  7. DCS tree - Preshower-SPD • Again Keep side splitting at higher level

  8. Rack Monitoring • A nice display tool exists • See Jean Luc presentation • For rack monitoring and more… • Problem : information • Turbines • Is INFDAI reliable enough ? • Crates • Temperatures read and stored • TVB, CB, CROC ? • Establish coherent temperature matches • Alarms ? • Actions ? Calo Commissioning Meeting - Xvc

  9. High Voltage • First version of monitoring exists throug HV calo panel • Might get more precision through Jean Luc 3D display • Will HV keep separated from the overall detector operation ? • CALO_HV_TOP Control Unit Calo Commissioning Meeting - Xvc

  10. Global Project Integration • Merge CA1, HC1, EC1 and PS1 into a single project • Should improve system effiency • Less connections between projects • Control Machines better balanced • A dedicated linux PC exists • caecs01 • Clara prepared a component for the migration • Thanks a lot • Everything is ready Calo Commissioning Meeting - Xvc

  11. Others • Automated restart of projects • Now project start is manual through Service + • Still waiting for a standard backup procedure • Radiative Source control Calo Commissioning Meeting - Xvc

  12. Plans - Priorities • Unified control project • In order to setup the DCS structure changes in the new project • DCS • Set up new structure and special logics • Confirm coherence of states and actions • Estblish order with respect to DAI • Detector Monitoring • Display detector information on the Control Room • Alarm levels • DCS • Decide Threshold values • Program them • Crates • Decide Threshold values • Program them Next week Week After Firenze Along GCW When Available ASAP after DCS Calo Commissioning Meeting - Xvc

  13. More plans • Follow • SPD VFE temperature • Radiative source • Decision on automatic project startup • Automated backup procedure • Move CRACKMON project to 3.8 and test • Before GCW • Values for alarms Calo Commissioning Meeting - Xvc

More Related