1 / 15

A Preliminary look at Peak Loads and Resources for 2007 and Policy Issues to Consider

Energy Action Plan. A Preliminary look at Peak Loads and Resources for 2007 and Policy Issues to Consider. David Ashuckian, P.E., Manager Electricity Analysis Office Joint Meeting December 11, 2006. Topics of this presentation. Review of 2006 weather adjusted demand.

sanne
Télécharger la présentation

A Preliminary look at Peak Loads and Resources for 2007 and Policy Issues to Consider

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Energy Action Plan A Preliminary look at Peak Loads and Resources for 2007 and Policy Issues to Consider David Ashuckian, P.E., Manager Electricity Analysis Office Joint Meeting December 11, 2006

  2. Topics of this presentation • Review of 2006 weather adjusted demand. • Preliminary look at Probability of meeting reserve margins in 2007. • Policy issues regarding the use of Demand Response and Interruptibles. • Review of CA ISO Emergencies called over the last 5 years and possible options for reducing frequency. Energy Commission

  3. 2006 ISO summer daily peak tracking 55,000 2006 actual 2006 estimated 50,000 45,000 MW 40,000 35,000 30,000 Estimate based on 2005 weather-load relationship, 2006 observed weather and 2005 IEPR growth rate 25,000 7/9 8/2 8/4 8/6 8/8 9/7 9/9 7/1 7/3 7/5 7/7 9/1 9/3 9/5 9/11 9/13 9/15 7/11 7/13 7/15 7/17 7/19 7/21 7/23 7/25 7/27 7/29 7/31 8/10 8/12 8/14 8/16 8/18 8/20 8/22 8/24 8/26 6/15 6/17 6/19 6/21 6/23 6/25 6/27 6/29 8/28 8/30 2006 Weather Adjusted Actual Loads Energy Commission

  4. 2007 Preliminary Outlook - Statewide Energy Commission

  5. 2007 Preliminary Outlook - Probability of meeting reserve margins for CA ISO Control area Energy Commission

  6. 2007 Preliminary Outlook - Probability of meeting reserve margins for CA ISO Control area Energy Commission

  7. 2007 Preliminary Outlook - Probability of meeting reserve margins for SP 26 Energy Commission

  8. Policy Issues that have surfaced • Generators have complained that Demand Response is not being called often enough. • Program operators concerned that excessive use of DR and Interruptibles will result in customers dropping out of program. Energy Commission

  9. Summary of CA ISO load Curtailments over the Last 5 years • Total number of Firm Load curtailments that have occurred over last 5 years: 2 (two) • March 8, 2004 • August 25, 2005 • Total number of Non-Firm (interruptible) load curtailments that have occurred over the last 5 years: 11 (eleven) • 2002 (3) - June 18 (SP 26), July 10, September 3. • 2003 (0) - • 2004 (4) - March 8 (SP26), May 3 (SP26), July 20 (SP26), September 14 (Humboldt). • 2005 (3) - July 21 (SP26), July 22 (SP26), August 25 (SP26). • 2006 (1) - July 24. Energy Commission

  10. Summary of CA ISO load Curtailments over the Last 5 years Energy Commission

  11. Policy issues to consider: • How can we tell when the number of load curtailments is excessive? • Because DR and Interruptibles do not reduce the probability of emergencies being called, • Is the CA ISO getting a bad rap? • Is the public being alerted when there may not be a true emergency? • What are some possible options to address these issues? Energy Commission

  12. Possible option to reduce number of emergencies: Add More Generation • Increase Resource Adequacy requirements. • Change Planning criteria from 1-in-2 to 1-in-10. • Pros: - Provides more generation. - Increases reserve levels at all times. • Cons: - Additional cost (at all times). - Resources not likely to be used frequently. - Likely to have only minimal effect on reducing the number of emergencies as most emergencies declared with additional generation available. Energy Commission

  13. Possible option to reduce number of emergencies: Add More DR and Interruptibles • Direct LSE’s to expand DR and increase number of Interruptible customers. • Pros: - Provides greater reserve margins once emergency is called. - Reduces need for additional generation resources. • Cons: - Additional cost (at all times). - Likely to have minimal effect on reducing the number of emergencies as resources are called after an emergency is declared. Energy Commission

  14. Possible option to reduce number of emergencies: Change tariffs • Change DR and/or Interruptible tariffs to allow use before emergency is declared. • Pros: - Reduces probability of emergencies being called. - Better Alignment of these resources with Loading Order. - Public is altered less, only for true emergencies and may be more apt to respond. • Cons: - May increase the frequency of use of these resources. - May reduce customer participation. Energy Commission

  15. Questions that might provide additional insight: • How many hours have interruptibles been called over the last 5 years? • How many times has an individual customer been interrupted over the last 5 years? • How have customers’ interruption histories compared with their agreements? Staff efforts are ongoing to gather additional information and data. Energy Commission

More Related