Project Summary • 30,000 SF Lot • 45,000 SF Building, 3 Stories • Oncology Treatment • OSHPD-3 Clinic • Occupancy Types = I-2.1 / B / S-2 • Construction Types = I-A & I-B • Subterranean Parking Structure, 6 Levels • LEED Gold • 100kW PV System Los Angeles Basin Chapter of ICC
Planning and Zoning Requirements • CP3 Zone • Maximum Height = 45 Feet (70 Feet) • Stories Maximum = 3 Stories (5 Stories) • Maximum Floor Area Ratio = 1.5 (2.5) • Hospital Area Specific Plan Los Angeles Basin Chapter of ICC
Planning and Zoning Requirements • 250 Parking Space Provided (min. 180) • Below Grade not Counted in FAR • Variance Parking • Sign Adjustment Los Angeles Basin Chapter of ICC
4 Lots • 30,000SF (200’ x 150’) • Vacant Single-Story Retirement Home (1941) • Vacant 6-Unit MFD (1946) Los Angeles Basin Chapter of ICC
Project Profile Los Angeles Basin Chapter of ICC
Project Summary • Design Architect = Michael Folonis, AIA Los Angeles Basin Chapter of ICC
Project Summary • Developer = Nautilus Group Los Angeles Basin Chapter of ICC
Automated Parking Structure • 6-Levels of Parking • 73,500 SF Parking (vs 145,000 SF) • 800A Feeder to (2) Parking Cranes Los Angeles Basin Chapter of ICC
Automated versus Conventional Los Angeles Basin Chapter of ICC
“Shelving System” Los Angeles Basin Chapter of ICC
Carrier System Los Angeles Basin Chapter of ICC
Automated Parking Structure Los Angeles Basin Chapter of ICC
6-Levels Los Angeles Basin Chapter of ICC
Design Considerations / Code Deviations • Acceptance by City? • No ADA Access • Elimination of Ramps, Elevators • Reduced Lighting in Garage • Reduced Egress Load • Reduced Garage Ventilation • Reduced Headroom • Modified Fire Access Los Angeles Basin Chapter of ICC
Under Construction Los Angeles Basin Chapter of ICC
Under Construction Los Angeles Basin Chapter of ICC
Installation Los Angeles Basin Chapter of ICC
eValet Los Angeles Basin Chapter of ICC
California Building Code • CBC Section 404.5: Atrium Smoke Control • CBC Section 404.7: Atrium Smoke Control Standby Power • CBC Section 406.2: Parking Garages • Clear Height, Guards, Vehicle Barrier Systems • CBC Section 903.2.10: Group S-2 Enclosed Parking Garages • Automatic Sprinkler System Throughout • CBC Chapter 10: Means of Egress Los Angeles Basin Chapter of ICC
Atrium Smoke Evacuation Los Angeles Basin Chapter of ICC
California Mechanical Code • CMC Section 403.8 Exhaust Ventilation Parking Garages • CMC Chapter 4: Ventilation Air Supply OSHPD-3 • CMC Chapter 6: Duct insulation OSHPD-3 Los Angeles Basin Chapter of ICC
California Electrical Code • Section 110.3(B) – Installation and Use • Article 690: PV Systems • 517: OSHPD-3 • 517.16: Isolated Ground Receptacles • 517.22: Artificial Lighting = IES • Part III. Essential Electrical System • Separate System, Transfer Switches, System Capacity, Identification • Separation from Other Circuits • 517.123: Call Systems Los Angeles Basin Chapter of ICC
Automated Entry Indication Los Angeles Basin Chapter of ICC
Indicator Lights Los Angeles Basin Chapter of ICC
Customer Lobby Los Angeles Basin Chapter of ICC
Kiosk and Car Carriage Los Angeles Basin Chapter of ICC
Automated Parking Structure Los Angeles Basin Chapter of ICC
Automated Parking Structure Los Angeles Basin Chapter of ICC
Accessibility Compliance Los Angeles Basin Chapter of ICC
Customer Viewing Windows Los Angeles Basin Chapter of ICC
Drop Off & Pick Up Los Angeles Basin Chapter of ICC
Automated Parking Structure Los Angeles Basin Chapter of ICC
Standards Applied to Unlisted Equipment • NEC • UL • IEEE Los Angeles Basin Chapter of ICC
Automated Parking Structure http://www.youtube.com/watch?v=LCPgH9wld_Q Los Angeles Basin Chapter of ICC
Automated Parking Structure Los Angeles Basin Chapter of ICC
Los Angeles Basin Chapter of ICC Ron Takiguchi, P.E. Building Official – City of Santa Monica ron.takiguchi@smgov.net Los Angeles Basin Chapter of ICC