1 / 18

Aviation Information Systems

Aviation Information Systems. 24 September 2002. ISD’s Core Products. ALMIS AMMIS (Aviation Maintenance Management Information System) ACMS (Aircraft Computerized Management System) EAL (Electronic Aircraft Logbook) Decision Support System (DSS)

satya
Télécharger la présentation

Aviation Information Systems

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Aviation Information Systems 24 September 2002

  2. ISD’s Core Products • ALMIS • AMMIS (Aviation Maintenance Management Information System) • ACMS (Aircraft Computerized Management System) • EAL (Electronic Aircraft Logbook) • Decision Support System (DSS) • ATIMS (Aviation Technical Information Management System) • ARSC Website • General Information Technology Support

  3. ALMIS AC&I Project • Four ALMIS Project goals • Provide source data entry • Integrate legacy systems • Improve decision support • Improve external system integration

  4. ALMIS AC&I Project – EAL • Phase 1 – Flight Schedule, Event Status, Aircraft Status • Phase 2 – Blue Sheet • Phase 3 – Yellow and Pink Sheet • Phase 4 – MPC / Supply integration • Phase 5 –MPC signoff online • Phase 6 – ACMS interface replacement

  5. ALMIS AC&I Project – DSS • Phase 1 – Aviation Inventory Control Point • Phase 2 – Reliability Centered Maintenance • Phase 3 – Flight Operations • Phase 4 – Finance and Procurement • Phase 5 – Unit Maintenance • Phase 6 – Depot Supply • Phase 7 – Depot Maintenance

  6. WSIII WSIII AMMIS Application ALMIS Portal EAL Application ACMS Application DSS Application ACMS GUI Application ALMIS Database WSIII printers Limited printers Non-Std WS ALMIS Status

  7. Electronic Aircraft Logbook • Flight Schedule, Event & Aircraft Status • Blue Sheet • Implemented Jan 2002 • Yellow/Pink Sheet • Implemented by Jan 2003 EAL Beta Sites

  8. ALMIS Evolution WSIII ALMIS Presentation Logic Non-Std WS AMMIS Business Logic ACMS Business Logic DSS Application EAL Business Logic ACMS GUI Business Logic ALMIS Database WSIII printers WSIII printers

  9. ALMIS Portal

  10. EAL

  11. DSS

  12. ALLDATA

  13. Definitive-Synchronized Delivery Mechanism Decentralized Content Creation Centralized Content Management Print Arbortext with Extensions Corel Draw CDROM Oracle Arbortext Data Repository ME10 Web ProEngineer Tech Illustrator Interleaf ATIMS

  14. ARSC Website • Manage ARSC administrative information • Educate personnel on aviation program / processes • Host ATTC training materials • Manage static legacy information

  15. Information Technology Focus • Complete security certifications • Upgrade information technology hardware • Complete deployment of Electronic Aircraft Logbook • Complete Decision Support System • Complete MPC content management upgrade • Implement systems into processes and pipelines

  16. How can you help? • Recognize that these are your information systems • Make sure someone in Engineering becomes local expert • Learn how system can help you serve your people better • Give us your feedback / suggestions for improvement • Consider ROI for recommended changes • Smart folks like you will make a difference

  17. Support Service User Requirement Initial Entry (1) (a) Initial Analysis (2) CCB Action (3) (10) Initial Entry (1) (4) A PVCS Tracker HEAT Work Plan Assignment (4) Analysis (2) Development Development (5) (b) (11) Peer Review (6) (c) CM Check-In (c) Build VDD Support Process Yes A(3) QA HEAT Status Sequence (1) Open  (4) Reopened (2) WIP (3) Closed PVCS Status Sequence (1) Unassigned (2) Analysis (3) CCB  (10) On-Hold (4) Assigned (5) WIP  (11) Return (6) Review (7) In QA (8) In Stage (9) Closed Checklists (a) Requirement (b) Development Worksheet (c) Peer Review (d) Functional Test (e) Integration Test (f) Staging Work Execution (2) Functional Test (7) (d) Integration Test (e) Staging Close Out (3) Acceptance Test (8) (f) Production Ready Production Close Out (9) (f) Production Figure 1 Key Business Processes Service and Support

  18. Demonstration?Questions?

More Related