1 / 13

OPERA

OPERA. Fatti principali dei precedenti 12 mesi. Nuvel History (no comment, but RPC are excellent !) management problems financial problems 2° tau candidate 19*10 19 p.ot at the end of 2012, 84% of foreseen statistics numu->nue analysis in progress

schuyler
Télécharger la présentation

OPERA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OPERA • Fatti principali dei precedenti 12 mesi. • Nuvel History (no comment, but RPC are excellent !) • management problems • financial problems • 2° tau candidate • 19*1019p.ot at the end of 2012, 84% of foreseen statistics • numu->nue analysis in progress • not decided about extension of run, yet • OPERA should exploit its physics goal: numu->nutau appearance Stefano Dusini / Luca Stanco - CdS Padova

  2. Stefano Dusini / Luca Stanco - CdS Padova

  3. Stefano Dusini / Luca Stanco - CdS Padova

  4. Stefano Dusini / Luca Stanco - CdS Padova

  5. Stefano Dusini / Luca Stanco - CdS Padova

  6. Lot of PHYSICS Analysis in progress… Stefano Dusini / Luca Stanco - CdS Padova

  7. Stefano Dusini / Luca Stanco - CdS Padova

  8. New run with short-bunch narrow spacing beam for nu velocity measurement • Improved OPERA timing system + White Rabbit system for continuous fiber time delay monitoring • Independent OPERA timing system used in parallel exploiting RPC Timing Boards • Improvements in the systematic errors in progress…. Stefano Dusini / Luca Stanco - CdS Padova

  9. LNL scanning lab members Microscopes in LNL Test scanning on the microscope with a new type of scanning table (designed by C. Fanin) in progress. Stefano Dusini / Luca Stanco - CdS Padova

  10. Laboratorio LNL 2010 run 81% located Interesting events: 1 kink topology +1 new charm candidate +1 nue candidate Scanning and analysis on 2011 run is going on. Additionally to OPERA event analysis, PADOVA scanning lab is contributing on the study of the volcanoes by muon radiography using nuclear emulsion film. In this project, we collaborate with Tokyo, Napoli, Salerno, l’Aquila Universities and LNGS. Stefano Dusini / Luca Stanco - CdS Padova

  11. U. Kose is contributing on numunue oscillations study and DATA/MC comparison. He is also co-supervising thesis work in Laurea Magistrale in Fisica, entitled ”Development of new tracking algorithm and Electromagnetic shower reconstruction tool in the OPERA nuclear emulsions using GPU.” E. Medinaceli is contributing on MC study to improve of our understanding on charm analysis, mainly on the detection efficiencies and background estimations. He also works on the implementation of decay search tool in the MC. Stefano Dusini / Luca Stanco - CdS Padova

  12. Situazione del gruppo: OPERA R.Bertolin (40%) R.Brugnera (30%) F.Dal Corso (10%) S. Dusini (60%). Responsabile Locale A. Garfagnini (40%) C.Fanin (10%) C. Sirignano (80%) L.Stanco (40%) Permanenti: Impegni per Padova: 1. Short run 2013 ? 2. Analisi 3. Automazione sviluppo 4. Lab. scanning emulsioni 4.4 FTE Umut Kose (assegnista) (70%) Eduardo Medinaceli (ass. Univ.) 60% Precari: Responsabilità nella collaborazione - Luca Stanco: Publication&Talk board, CB - Stefano Dusini: Ad Interim Physics Coordinator, EC - Alessandro Bertolin: Project Leader RPC-XPC - Alberto Garfagnini: Slow Control supervisor - Chiara Sirignano / Umut Kose: Dark Matter Contributi dall’OE e OM per turni specializzati al Gran Sasso di - Sviluppo fotografico delle emulsioni in camera oscura - Analisi automatica di Scanning dei CS Stefano Dusini / Luca Stanco - CdS Padova

  13. Richieste finanziarie 2013 Missioni Interne: 110.5 +12(s.j.)+10(DM) Trasporti: 0 K€ Missioni Estero: 43 +10(DM) Costruzione Apparati: 28 K€ Consumo: 43 K€ Inventario: 0 K€ Tot (Padova).: 224.5+12(s.j.) + 20(DM) Manutenzione: 0 K€ Common Funds (Italia) circa 480 K€ Richieste ai servizi per il 2013: Elettronica: 1 m.u. per supporto maintenance Elettr. RPC 3 m.u. per shifts presso i LNGS Meccanica: 4 mesi uomo per shifts presso i LNGS Uffico Tecnico: 2 mesi per sviluppo lab. Scanning (incluso Fanin) Stefano Dusini / Luca Stanco - CdS Padova

More Related