'Cosmic data' presentation slideshows

Cosmic data - PowerPoint PPT Presentation


Based on Phys.Rev.D84:043515,2011, arXiv:1102.1513 & JCAP01(2012)016

Based on Phys.Rev.D84:043515,2011, arXiv:1102.1513 & JCAP01(2012)016

Gauge- flation. Malek-Nejad M. M. Sheikh- Jabbari. Based on Phys.Rev.D84:043515,2011, arXiv:1102.1513 & JCAP01(2012)016. Cosmo-12. Inflation has many realizations …. F. R. Bouchet : “CMB anisotropies, Status & Properties”. Scalar inflation.

By ophira
(93 views)

IST Software Status

IST Software Status

IST Software Status. Yaping Wang (University of Illinois at Chicago). Outline Offline software infrastructure Offline raw hit/cluster/hit structure Offline makers and IST geometry Online software status Summary and Plan. IST offline chain infrastructure.

By caden
(207 views)

ALICE QUARTERLY REPORT 2009Q3

ALICE QUARTERLY REPORT 2009Q3

ALICE QUARTERLY REPORT 2009Q3. 6 October 2009. 1. ALICE 2009Q3 report. Summary. Data Taking Resumed since August (cosmic, calibration and injection tests) Data Processing Cosmics and calibration data being continuously processed at T0 MC Data Production

By jenaya
(84 views)

64-Straw Prototype

64-Straw Prototype

64-Straw Prototype . Vito Palladino CERN 07/ 04/2013. Outlines. The 64-straw prototype, in building 154, is our “easy” hand-on test bench. We are using the prototype to: Debug the DAQ Study the time resolution The r/t dependence HV and gas mixture signal dependence

By thuong
(136 views)

CSC DQA for Last Week

CSC DQA for Last Week

CSC DQA for Last Week. Ken Johns, Venkat Kaushik, Xiaowen Lei University of Arizona. Overview. Online Runs 124747 and 124887 DQMF segment not run – must work with M. Schernau to include Point 1 access initially denied – must resolve with Muon shift leaders in future Offline

By nira
(100 views)

Study of correlation between track based MET and Calo based MET using cosmic data

Study of correlation between track based MET and Calo based MET using cosmic data

Study of correlation between track based MET and Calo based MET using cosmic data. Zhijun Liang ,Song-Ming Wang ,Dong liu, Rachid Mazini Academia Sinica. Why measuring MET with track?. Provide an alternative measurement --Different detector has different un-related systematic effect

By brendy
(117 views)

Calorimeter Cosmic-ray Commissioning Run Dec ’00 – Jan ‘01

Calorimeter Cosmic-ray Commissioning Run Dec ’00 – Jan ‘01

Calorimeter Cosmic-ray Commissioning Run Dec ’00 – Jan ‘01. Lar in CC and ECN; HV turned on (2kV) for both Two quadrants of CC (CCNE+CCSE) fully populated with BLS cards and preamps

By dermot
(69 views)

Calibration of the calorimeter by punch-through muons and cosmic muons

Calibration of the calorimeter by punch-through muons and cosmic muons

Calibration of the calorimeter by punch-through muons and cosmic muons. Doroshenko M. E391 collaboration. Punch-through muon. Beam: muon. Punch-through muon. Gain. CsI crystall: 7x7x30 cm – 168 MeV 5x5x50 cm – 280 MeV. Crystal, ID. Relative error. Crystal, ID. Cosmic muon.

By uyen
(130 views)

Outline

Outline

COSMIC Data Analysis and Archive Center (CDAAC) UPDATE Bill Schreiner B. Kuo, C. Rocken, S. Sokolovskiy, D. Hunt, X. Yue, Z. Zeng, K. Hudnut, M. Sleziak-Sallee, T. VanHove, J. Lin UCAR/COSMIC Program Office. Outline. COSMIC Program Office Status COSMIC System Status CDAAC Status

By dee
(158 views)

Outline

Outline

COSMIC Data Analysis and Archive Center (CDAAC) Activities, Ionospheric Research Bill Schreiner B. Kuo, C. Rocken, S. Sokolovskiy, D. Hunt, X. Yue, Z. Zeng, K. Hudnut, M. Sleziak-Sallee, T. VanHove UCAR/COSMIC Program Office. Outline. COSMIC System Status CDAAC Status

By taran
(72 views)

Outline

Outline

By lars
(71 views)

Bill Kuo UCAR COSMIC Project

Bill Kuo UCAR COSMIC Project

COSMIC: Constellation Observing System for Meteorology, Ionosphere and Climate Formosa Satellite #3 (FORMOSAT-3). Bill Kuo UCAR COSMIC Project. FORMOSAT-3. COSMIC (Constellation Observing System for Meteorology, Ionosphere and Climate). 6 Satellites was launched: 01:40 UTC 15 April 2006

By cosmo
(180 views)

ROSA – ROSSA Validation results

ROSA – ROSSA Validation results

ROSA – ROSSA Validation results. R. Notarpietro, G. Perona, M. Cucca riccardo.notarpietro@polito.it. INPUT DATA. COSMIC Data - COSMIC 1: 75 events ( 10 rising) well distributed in time (2 days for each 06-07 season) and space - COSMIC 2: data related 31/12/2007 ( 1120 events).

By luther
(80 views)

Processing of GRAS raw sampling data

Processing of GRAS raw sampling data

Processing of GRAS raw sampling data. K. B. Lauritsen (DMI), M. E. Gorbunov (IAP), C. Marquardt (EUM), M. Bonnedal (RUAG), H.-H. Benzon (DMI), G. B. Larsen (DMI), S. Syndergaard (DMI), M. B. Sørensen (DMI), and the GRAS RS performance study team ESA contract no.: 21995/08/NL/EL.

By starbuck
(118 views)

ACORDE Status Report Detectors Status – Alice Offline Week June 22th 2009

ACORDE Status Report Detectors Status – Alice Offline Week June 22th 2009

ACORDE Status Report Detectors Status – Alice Offline Week June 22th 2009. Mario Rodríguez Cahuantzi FCFM - BUAP, Puebla, México on behalf the ACORDE Mexican Group. Outline. Alignment Calibration. Geometry Summary. Alice Offline Week June 2009 MRC – Detector Status.

By vilmos
(97 views)

TPC R&D in Canada

TPC R&D in Canada

TPC R&D in Canada. Dean Karlen / University of Victoria & TRIUMF Canadian LC-TPC Group: Carleton University: Robert Carnegie, Madhu Dixit, Hans Mes, Kirsten Sachs University of Montreal: Jean-Pierre Martin

By skah
(91 views)

Use of COSMIC data in ECMWF’s global data assimilation system for numerical weather prediction

Use of COSMIC data in ECMWF’s global data assimilation system for numerical weather prediction

Use of COSMIC data in ECMWF’s global data assimilation system for numerical weather prediction. Sean Healy Presented by Erik Andersson. Outline. Performance of GPSRO in a recent adjoint-based impact study: forecast error sensitivity to observations (FSO)

By trang
(147 views)

COSMIC Interagency Meeting Dallas

COSMIC Interagency Meeting Dallas

COSMIC Interagency Meeting Dallas. What is COSMIC?. A constellation of eight micro-satellites will be launched into low earth orbit (~800 km) in December 2002. Each satellite will carry a GPS receiver, a tiny ionospheric photometer, and a tri-band beacon transmitter.

By jonah-mack
(83 views)

Detector Algorithm Quality Assurance Experience with cosmic ray data taking Reconstruction

Detector Algorithm Quality Assurance Experience with cosmic ray data taking Reconstruction

PMD Software Status. Outline. Detector Algorithm Quality Assurance Experience with cosmic ray data taking Reconstruction Alignment. Ajay Kumar Dash For the PMD. ALICE offline week, CERN. Hardware Mapping information. SDigits. keV-ADC Conversion From Test Beam.

By athena-gibson
(115 views)

CKOV Update

CKOV Update

CKOV Update. CKOVa/b hardware completed at IIT/Iowa/Mississippi by Sept. CKOVa stored at RAL-R12 for Cosmic test. Aerogel compartments and front window refit after excessive bowing of front window realized. Aerogel will be loaded in to CKOVa/b in early November for cosmic test.

By hayes-bauer
(112 views)

View Cosmic data PowerPoint (PPT) presentations online in SlideServe. SlideServe has a very huge collection of Cosmic data PowerPoint presentations. You can view or download Cosmic data presentations for your school assignment or business presentation. Browse for the presentations on every topic that you want.