Base Case Coordination System RFP. David Franklin BCCS System Review Group/Planning Tool Subcommittee (PTS) Pre-Bid Conference Salt Lake City, Utah. BCCS Pre-Bid Conference Agenda. Introductions Meeting Arrangements BCCS Purpose Overview Planning Model Operating Planning Interface
E N D
Base Case Coordination SystemRFP David Franklin BCCS System Review Group/Planning Tool Subcommittee (PTS) Pre-Bid Conference Salt Lake City, Utah
BCCS Pre-Bid ConferenceAgenda • Introductions • Meeting Arrangements • BCCS Purpose Overview • Planning Model • Operating Planning Interface • Change Control Methodology • PTS’s Evaluation Methodology of Vendor Proposals • Responses to Vendors’ Questions on BCCS RFP • Next Steps • Meeting with Final Vendors • Kick Off Meeting
Purpose of RFP • Centralized Data Base • Improve Communications • Improve Data Accuracy • NERC Requirements (MOD Standards) • Load & Resources • Increase number of base cases per year • Produce Base Cases Independent of Power Flow Platform • BCCS Integration • Bus/Branch Model and Node/Breaker Model • Topology Processor
BCCS – Node-Breaker Integration • Planning models have Bus-Branch structure • BCCS will be able to hold Node-Bkr and Bus-Br data • Planning data can be produced from node-breaker data • BCCS data will be used in operation models as projects are constructed and are placed in-service • Operations/Planning coordination is required
RFP Distribution • Operating Committee • Planning Coordination Committee • Technical Studies Subcommittee • System Review Work Group • Interested Vendors, System Integrators, and Consultants • Seven vendors responded they intend to bid
Pre-Bid Conference • Existing processes and problems • BCCS Structure and use • Explanation of Project concept • BCCS RFP response review process • Next Steps after review process • SRWG, TSS, PCC approval of selected vendor