An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Demonstrator Racks Rack coordination meeting25 November 2004

  2. Aims • To construct complete racks to represent the two types of installation • ATLAS/CMS • ALICE/LHCb • Including • A representative set of subracks • Electrical distribution • Cooling • Control • To allow studies to be made on: • Rack control • Subrack installation • Cable management • Cooling Rack Coordination

  3. Status • Three racks are in place in 4-S-060 • One ATLAS/CMS rack • One ALICE rack • One LHCb rack • Cooling water connections • Next week • Electrical connection • ATLAS/CMS done – Canalis + distribution chassis • ALICE/LHCb next week • Control • See other report • Rack equipment • Rack attachments – waiting on delivery of parts • Heat exchangers – delivered, problem with water connections • Turbine chassis – waiting on prototypes • VME subracks • 9U water cooled – available • 9U air cooled – available • 6U water cooled – available • 6U air cooled – available • Installation complete for the end of the year • Available to experiments for installation tests, etc. – January Rack Coordination

  4. Racks – ATLAS/CMS, LHCb & ALICE Rack Coordination

  5. Power distribution chassis Rack Coordination Rear of turbine chassis 4 outlets To Twido