The 2nd Thermosyphon Workshop at CERN focuses on validating the thermosyphon concept through a low-cost, small-scale test. Key objectives include studying system behavior during startup, operation, and shutdown phases, as well as gaining operational experience. The setup features a thermodynamic cycle with an available height of 13m and a maximum pressure differential of 1.9 bar, with ongoing installation preparations and expected first results in 6 to 8 weeks. Advancements include received quotations and the initiation of pipe installations in Building 191.
E N D
Mini-Thermosyphon CP Test J. Direito (EN/CV/DC) 2ndThermosyphon Workshop, CERN
Objectives • Validation of the Thermosyphon concept in a small scale test (low cost). • Study the behavior of system during Start up/operation/shut down (data acquisition) • Gain experience during operation of this small scale test. 2nd Thermosyphon Workshop, CERN
Thermodynamic Cycle • Available Height of 13m => max dP of 1.9 bar 2nd Thermosyphon Workshop, CERN
Layout at B-191 Condenser Chiller Dummy Load 2nd Thermosyphon Workshop, CERN
P&I ~15m 2nd Thermosyphon Workshop, CERN
Part List(1st estimation) 2nd Thermosyphon Workshop, CERN
Advancement Status • Quotations received and DAI’s lunched • Installation of pipes in Building 191 in 2-3 weeks • Installation of components in 3-4 weeks • Control system is being prepared • First results in 6 to 8 weeks 2nd Thermosyphon Workshop, CERN