1 / 6

Schedule for cool down (March 2008)

Schedule for cool down (March 2008). Strategy for 2008 2009. 2008. A. No beam. Beam. 2009. B. C. No beam. Beam. Stage A physics running for ALICE and LHCb. 43 (44) equidistant bunches Need to do something for LHCb Previously thought to displace bunches in one beam (asym)

sibley
Télécharger la présentation

Schedule for cool down (March 2008)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Schedule for cool down (March 2008)

  2. Strategy for 2008 2009 2008 A No beam Beam 2009 B C No beam Beam

  3. Stage A physics running for ALICE and LHCb • 43 (44) equidistant bunches • Need to do something for LHCb • Previously thought to displace bunches in one beam (asym) • Can do better (symmetrically displace bunches in both beams) • Allows to adjust luminosity sharing between 2 and 8 while keeping maximum number of collisions in 1 and 5

  4. Parameters for 5TeV run

  5. Parameters for 5TeV run

  6. TBSO • Parameter list • Circuits and currents • What is needed, what is not • What do we do about magnets at zero field • Implications • Experiment magnets will be at 7TeV field • Collimators • Getting ready for 2009 • Training to 7TeV • Circuits not commissioned in 2008 • 75ns and 25ns operation • ions

More Related