1 / 9

RVR History & Initiatives

RVR History & Initiatives. CDM WG MEETING JUNE 28, 2000 Miro Lehky. History . Pre ASOS (The Good’Ole Days) RVR Provided In Remarks of SA Manually NWS Sites Only 40% Total RVR Sites Utilized Rolling Drum Readout Provided For a Single Designated Runway. History.

sierra
Télécharger la présentation

RVR History & Initiatives

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RVR History & Initiatives CDM WG MEETING JUNE 28, 2000 Miro Lehky CDM Meeting

  2. History • Pre ASOS (The Good’Ole Days) • RVR Provided In Remarks of SA Manually • NWS Sites Only • 40% Total RVR Sites • Utilized Rolling Drum Readout • Provided For a Single Designated Runway CDM Meeting

  3. History • Post ASOS (Oh the Joy of Automation) • ASOS - RVR Interface Not Provided • Historical RVR Site List Developed • Initial List 114 / Final List 119 • Provide Equivalent Level of Service • Initially Manual • Automation Developed • Service Levels A, B, C, and D Developed CDM Meeting

  4. RVR Issues • US vs. ICAO Standards • US Only Provides RVR At Historical Sites • RVR Operational Usage's • Loss of Real-Time RVR at Select Locations CDM Meeting

  5. US Standards One Designated Runway TZ Only No Report of Tendency Measure in Feet Light Step 5 10 Minute Avg. 10 Minute Avg. 10 Minute Avg. Body of METAR SPECI at 1 Level (2400) ICAO Standards Up to 4 Runways TZ Only Report Tendency Measure in Meters Light Setting In Use 10 Minute Avg. Report Discontinuities RVR Only After Discontinuity Body of METAR SPECI at 4 Levels Long Line Standards CDM Meeting

  6. Long Line Proposal • ATA Met Committee Proposal (May 21, 1999) • Up to 4 Runways (Per ICAO) • TZ Only (Per ICAO) • Report Tendency (Per ICAO) • Measure in Feet (Per FAA) • Light Step 5 (Per FAA) • 10 Minute Avg. (Per ICAO) • Report Discontinuities (Per ICAO) • RVR Only After Discontinuity (Per ICAO) • Body of METAR (Per ICAO) • SPECI at 4 Levels (600, 1200, 1800, 2400) (Per ICAO/Modified) CDM Meeting

  7. Long Line Deployment • Current • 150 Interface Cards Acquired • Installation Underway • Future • Adapt ICAO Standards • Software Only Mod (ASOS) • Card Mod for 4 Runways (.5 Mil) • Money and Timeline to Be Resolved CDM Meeting

  8. Real-Time RVR • Real Time Feeds WhereAvailable at Some Sites • Local Real-Time RVR Capability Lost With Deployment of NEXGEN RVR • Real-Time RVR Under Development • Presentation to Follow CDM Meeting

  9. Real-Time RVR Usage • Situational Awareness • No FAA Issues / Possible Ops Spec Listing • Basis of Dispatch / Release • Regulatory (GC) Issues Will Prove Challenging • Closed Facility / Commence Approach • FAA Open To Discussion • Comfort With Technology / Procedures • Forecasting / TAFs • Access To RVR Data / Technique Development CDM Meeting

More Related